THE MAGAZINE FOR THE DRAINAGE, WATER & WASTEWATER INDUSTRIES
CASE STUDIES
projects.
Joshua Urquhart, Lining Field Manager at Cappagh Group commented: ""We couldn't be more pleased with the outcome of our recent pipe rehabilitation project in Swindon. The SAERTEX-LINER and the Starlight UV system exceeded our expectations in terms of performance and efficiency. The SAERTEX-LINER S+ proved to be exceptionally durable and resistant to the challenging conditions of the project site, providing a long-lasting solution for our rehabilitation needs.”
“Additionally, the Starlight UV system's rapid curing capabilities significantly streamlined our installation process, allowing us to complete each length of liner within a remarkably short timeframe. The uniform curing ensured the integrity of the liners, giving us confidence in their long-term reliability.”
He continued, “Furthermore, as always, it’s been a pleasure to work with S1E. From assisting in the supply of the liner to providing on-site guidance and expertise, they provided fast delivery and their support throughout the project was excellent.”
Despite the challenges posed by the project's location and the condition of the pipes, the collaborative efforts of S1E Ltd, support from a technician from SAERTEX multiCom and Cappagh Group ensured a successful project completion. Despite the extensive prep work required, each length of liner was successfully installed and cured within three hours; the project was ultimately completed in two weeks with each liner taking three days to install.
S1E Ltd's support, coupled with the expertise of Cappagh Group's lining team,
TRACTO connections made in Glastonbury
Difficult ground conditions called for a specialist solution when new PE pipes for potable water services had to be installed underneath two, 10-metre road crossings in the grounds of the UK’s ultimate music festival at Worthy Farm
The geology of the bore was a mixture of rocks and boulders, with only a small layer of clay and the added issue of very wet ground conditions. The project screamed out for a mole and the TRACTO GRUNDOMAT 145 was identified to supply sufficient power and thrust to bore under an inner road on the farm. After the initial bore, the GRUNDOMAT was reversed back to the start pit towing a 32mm and 90mm PE pipe and a 63mm and 32mm on the 2nd to install new water pipes for the extended camp site.
The bores were undertaken by experienced GRUNDOMAT and HDD operator, Arnie Bailey, and were very successful - coming out at the correct depth and right in the centre
FOLLOW US
of the pits. Both Arnie, who runs Arnie Bailey Enterprises Ltd offering drilling consultancy and NO-dig operations, and the client were delighted at the accuracy achieved and the ease with which the GRUNDOMAT towed the pipes through the bore;
“We managed a very precise and accurate bore even though we couldn’t see the reception pit from the start pit due to the overgrowth of hedges on either side of the road. The GRUNDOMAT tackled the whole job with ease, as usual and the customer was over the moon with completion of the project; which has ensured services can be connected to the existing mains over a mile away and in good time for the festival.”
June 2024 | 21
was instrumental in the successful execution of the pipe rehabilitation project in Swindon. The project highlights the importance of effective collaboration, innovative solutions, and skilled workforce in overcoming challenges and achieving project objectives within constrained environments.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84