search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
4


NEWS


Managing Editor James Parker


Publisher Anthony Parker


Account Director Midge Myatt


Senior Account Manager Steve Smith


Digital Marketing & PR Account Manager Suzanne Easter


Operations Director Shelley Collyer


Editorial Contributor Stephen Cousins


Events Coordinator Amy Madigan


Studio Manager Mikey Pooley


Production Assistant Georgia Musson


Digital Production Coordinator Kimberley Musson


Feature Coordinator & Publisher’s Assistant Kim Neville


Finance Director Simon Reed


Advertising & Administration 01435 863500


info@netmagmedia.co.uk Press Releases


editorial@netmagmedia.co.uk Registration &


Circulation Enquiries info@netmagmedia.co.uk


P


assivhaus is probably a lot less expensive than you think, that’s not only the assertion of co-director at the Passivhaus Trust, Ann-Marie Fallon, on our 101st Building Insights podcast, which just landed. It’s also about to be proved with compelling research due to be published, which is likely to change the case for mainstreaming Passivhaus.


The really attention-grabbing part of Ann-Marie’s fantastic discussion (almost treatise) on Passivhaus however was that is a guarantee of quality which will not only protect consumers and clients, but contractors, as quality expectations ramp up. Post-Building Safety Act, we have Principal Designers and Principal Contractors, but now we also have a pair of retrospective limitations which extend back to 15 years for newer schemes, but also 30 years for schemes designed before 2022. While Passivhaus isn’t strictly about building safety, the new culture of accountability for decision-making, transparency and change control is being forced by such ruthless new strictures. It’s to be welcomed, but it’s also hugely demanding for everyone in the sector, used to a very different, cost-focused set of priorities. However, as Ann-Marie points out, Passivhaus stands as a ready-made, not to say onerous, system of quality assurance, which can give construction teams the surety that they have abided by a golden thread process. As well as costs coming down progressively, even in the current materials infl ation context, this could be game-changing.


An Employee Owned Company


Cointronic House Station Road, Heathfi eld East Sussex, TN21 8DF


London has been the hotbed of Passivhaus at scale so far, with for example Barratt London committing to building all new homes to the standard (although medium or high-rise apartments rather than houses). This may be pragmatic, to avoid having to be part of heat networks – which will short term be fossil fuel in any case – but the result is likely to be an unseen level of mainstream Passivhaus residential projects in the capital. The Mayor and GLA has to take some credit for this, with the London Plan having driven constructors to achieve Passivhaus as a default target for hitting the demanding building effi ciency goals the boroughs want to see.


The robustness with which London has driven through new standards is seen to be something that other Mayors should be emulating, particularly around calling-in worthy projects which planners are unhappy about, for central direction. But some across the sector are concerned to know just how far this will extend, and what the criteria will be.


Annual subscription costs just £48 for 12 issues, including post and packing. Phone 01435 863500 for details. Individual copies of the publication are available at £5 each inc p & p. All rights reserved


No part of this publication may be reproduced or transmitted in any form or by any means, electronic, mechanical, including photocopying, recording or stored in any information retrieval system without the express prior written consent of the publisher. Although every effort is made to ensure the accuracy and reliability of material published in Architects Datafi le, the publisher can accept no responsibility for the claims or opinions made by contributors, manufacturers or advertisers. Editorial contributors to this journal may have made a payment towards the reproduction costs of material used to illustrate their products. The manufacturer of the paper used within our publication is a Chain-of-Custody certifi ed supplier operating within environmental systems certifi ed to both ISO 14001 and EMAS in order to ensure sustainable production. Printed in England


This magazine may be recycled


The hope is that the age of the NIMBY will be forcibly ended, and this might be a requirement to get certain Passivhaus projects through, regardless of their design qualities. It’s about time that broader concerns were brought to bear rather than just the vested interests of individuals, on a national basis. But those NIMBYs won’t go down without a fi ght.


James Parker, Editor


FROM THE EDITOR


Looking to update or cancel your ADF registration? Scan the QR code to visit our registration page. From here you can also register for our Digital


Issues and Newsletters. Alternatively, please visit architectsdatafi le.co.uk/subscribe


THE CHANCERY ROSEWOOD How David Chipperfi eld Architects turned the former US Embassy in Grosvenor Square into a super-luxe hotel


ADF_09_2026 OFC.indd 1 03/09/2026 11:21


09.26


ON THE COVER... How David Chipperfi eld Architects turned the former US Embassy in Grosvenor Square into a super-luxe hotel.


Update your registration here:


Cover image © Simon Menges For the full report on this project, go to page 34.


WWW.ARCHITECTSDATAFILE.CO.UK


ADF SEPTEMBER 2026


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78