search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
October 2026


www.us-tech.com


Engineering Parylene Protection for PCB Assemblies...


Continued from previous page Higher-temperature or ul-


traviolet exposure may warrant Parylene HT. For severe corro- sion or exceptionally thin barrier requirements, atomic layer depo- sition (ALD) combined with Parylene may be considered. These alternatives add qualifica- tion and supplier requirements and should be justified by the ac- tual environment.


Matching Protection to the Risk


Each anticipated failure


mechanism needs corresponding process controls and verification. Moisture-related leakage, for ex- ample, requires attention to coating continuity, adhesion, residues, and coverage around low-standoff


components.


Humidity exposure and insula- tion-resistance testing can help establish whether the chosen system provides adequate pro- tection. Corrosion resistance de-


pends on surface preparation, coverage at edges and material interfaces, and the treatment of exposed metal keep-outs. Salt fog or mixed-flowing-gas testing may be appropriate, depending on the service environment, fol- lowed by electrical and visual evaluation. Conformal coating can also


reduce the risk of tin whisker shorts by containing or capturing whiskers, provided coverage, ad- hesion, and mechanical proper- ties are adequate. It does not re- move the need for a whisker risk assessment. Similarly, improved dielectric protection at sharp conductors must be evaluated alongside the assembly’s spac- ing, contamination controls, and electrical test requirements. Coverage beneath compo-


nents should be verified where it matters. Vapor deposition can reach complex exposed geometry, but a nominal chamber thickness does not prove adequate protec- tion at every functional surface. Coupons, direct measurements, or cross-sections may be needed to evaluate critical locations. Coating also requires con-


sideration of mechanical interac- tions with packages and solder joints. Thermal cycling can help assess the combined effects of the package, coating, underfill, and sealant system.


Cleanliness and Masking Flux residues, ionic contam-


ination, silicone transfer, and cleaning residues can weaken adhesion or remain trapped be- neath the film. Localized con- tamination under connectors and low-standoff components may be difficult to detect visually, mak- ing the cleaning process and ver-


Americas Smart And Steady Innovation


NEED MORE REASONS? VISIT OUR SITE OR CALL 636-888-4811 sasinnoamericas.com


TO RS ISSUE 72 See at SMTAI, Booth 3023 25


ification method important parts of the specification. Adhesion results must be


tied to a defined method, speci- men condition, thickness, and ac- ceptance criterion. Inconsistent substrates or excessively deep cuts during tape testing can pro- duce misleading results. Drawings should clearly dis-


tinguish coated surfaces from keep-outs and specify the re- quired thickness range. Masking defects can block connectors, af- fect switch operation, or inter- fere with solderability. Removing


masking or repairing a coated assembly can also damage coat- ing boundaries, so approved re- moval methods and post-rework inspection belong in the plan be- fore production begins.


Defining Acceptance and Qualification


Production acceptance and


application qualification answer different questions. Acceptance confirms that a particular lot was processed correctly. Qualification establishes whether the coating system is suitable for its intended


environment. Evidence may include visual


inspection, thickness and adhe- sion measurements, cleanliness verification, electrical testing, hu- midity exposure, or thermal cy- cling. The required combination should follow the customer draw- ing, purchase order, and applica- ble contractual requirements, with testing proportionate to the consequences of failure. An effective request for quo-


tation should include the assem- bly revision, coating and keep-out


Continued on page 61


5BIG FOR SOLDERING


SMART AND STEADY INNOVATIONS IN YOUR BUSINESS SASINNO Quality Service Cutting-Edge Technology Global Expertise 5 BIG REASONS:


001. HQ in St Louis, MO 002. Customer Focused Solutions 003. Service & Support 004. Network of Local Reps 005. 24/7 Support


5 BIG REASONS: 001. 002. 003. 004. 005.5.


Inline 5 BIG REASONS:


Fully Automated Wave Solder High-vol Inline Selective Solder High Quality/Low Cost Batch Solder Intigrated Inspection Inline Solder Rework


001. Global Partners 002. International Support 003. Process Partners 004. Quality Focused 005. Cost Minded


Page 59


REASONS


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92