PLANT MANAGEMENT
Conducting work on control panels in phases minmises disruption
OBSOLESCENCE O
CONTROLLING
Maria Torrisi describes how to manage obsolescence in industrial control panels
ver the past 50 years, a growing number of industrial businesses have adopted computer-based automation systems. However,
many of these systems are now nearing their official end-of-life and becoming obsolete, leaving engineers with the challenge of managing obsolescence effectively. Here, we explain how industrial plant managers can manage obsolescence in control panels. Te control panel is the backbone of the modern industrial plant. Whether a business is at the forefront of the Fourth Industrial Revolution or focused more on day-to-day production, automation is pivotal for modern industrial companies. Although these systems present plant managers with a wealth of benefits in the form of efficiency savings and improved effectiveness, their importance is beginning to pose a unique challenge for industrial businesses. Today, many plants still use the control panels installed several decades ago, which means they are now verging on obsolescence.
24
www.engineerlive.com
Although businesses can partner with specialists to supply obsolete industrial components, a growing number of plant managers are realising that modernising systems is more beneficial and less risky in the long-term. However, this is rarely an easy task, as the control system is often responsible for controlling an important process that can significantly harm productivity if stopped.
CASE IN POINT For example, it might be that a control system is responsible for managing a conveyor in a dairy production plant. Since dairy is a sensitive food item that must be handled carefully and promptly with full traceability, even a momentary pause in production can mean an entire line of product must be disposed of to ensure safety standards. So, how do you manage obsolescence in a critical control system? From JMartans’ experience as a systems integrator in Malta, it has found that the best approach is to complete an upgrade or replacement
project in phases. By doing this, plants can minimise operational disruption. Tis could mean replacing the front end of a control system first, such as by modernising a SCADA system and ensuring it works with the obsolete components and equipment, before upgrading those individual obsolete parts. A systems integrator taking this phased approach can then avoid causing costly, unwanted downtime and ensure systems remain operational. Te reason many industrial businesses continue using legacy equipment purchased decades ago is often due to the risk of planned downtime affecting performance. By working with an experienced automation systems integrator plant managers can get the best of both worlds: an effective, modern control panel without lost production.
Maria Torrisi is with JMartans Automation.
www.jmartans.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68