search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
82 HEATING, VENTILATION & SERVICES


TROX laboratory air management system installed for Quadram Institute


environmental performance in a major new clinical and research facility. The TROX EASYLAB system, incorporating TROX VAV controllers, specialist filters, grilles and diffusers, will assist Norfolk-based Quadram Institute to meet the stringent requirements for its world-class research. To meet the complex and critical


A


air management demands of the project, BuroHappold Engineering and SES Engineering Services worked in close co-operation with TROX UK to design and install the air management systems for the new site. During the design phase, wind tunnel


testing was carried out to determine safe fume efflux parameters for the scheme. TROX also analysed the air terminal device requirements of different zones in the building during the design phase, to determine the best possible


dedicated laboratory air management system, supplied by TROX, has been installed to optimise safety and


designs of grilles and diffusers to maintain the optimum safe and comfortable working environment for researchers, staff and patients. To account for the specific research operations carried out in separate departments across the site, TROX worked with the design team and other experts to determine the most appropriate HEPA filter cells and diffusers, and installed specific room pressure control capabilities for the Containment Level 3 labs, and volume offset tracking controls for the Containment Level 2 spaces. The resulting TROX EASYLAB room air management system installed in the new


facility ensures that supply and extraction of air is optimised automatically in each laboratory to maintain safe working environments. In addition, TROX Variable Air Volume (VAV) controllers ensure that the energy efficiency of the building’s central air conditioning and cooling system is also optimized for best-in-class environmental performance across the site as a whole. Ian Thomas, Product Technical Manager –


Air Products at TROX UK, commented: “The Quadram Institute will be carrying out essential research and it was important that the building itself could operate safely at all times, with advanced control of air supply and extraction to meet the stringent requirements. The TROX EASYLAB system will enable the Institute to continue its vital work, confident in the knowledge that the best possible systems are in place to ensure best-in-class performance.”


01842 754545 www.troxuk.co.uk


WWW.ARCHITECTSDATAFILE.CO.UK


ADF FEBRUARY 2020


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124