search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
112 SAFETY & SECURITY; LANDSCAPING & EXTERNAL WORKS


Advanced’s High Rise Reputation sees it Protect European Landmark


S


et to stand at 62-storeys high, 22 Bishopsgate in the City of London will, on completion, become the second-


tallest building in Western Europe. The 278m office building will offer 1.275


million sq. ft of high specification office space, as well as eight community spaces, covering over 100,000 sq ft, including an innovation hub, curated gallery space, fresh food market, gym and wellbeing retreat. Once completed, Advanced will protect both of Western Europe’s tallest buildings, with 22 Bishopsgate being the latest in a long line of London’s most prestigious and iconic skyscrapers specifying Advanced, including the Shard, the Leadenhall Building, the Heron Tower and the HSBC Tower. At the centre of the active fire protection


for 22 Bishopsgate are over 80 networked MxPro 5 panels with graphic display and BMS integration, alongside three special build panels for the building’s Fire Command Centre, that will form part of the intelligent


verification devices to deliver a system that allows the false alarm strategy for 22 Bishopsgate to be quickly and easily programmed and managed, increasing safety and reducing false alarms. The three custom-made panels; a wet riser


fire detection network. Advanced’s panels are used alongside Apollo’s Soteria detectors and its networking is widely regarded as the most resilient and scalable solution on the market. It can be expanded up to 200 node networks covering huge areas with complicated cause- and-effect. In order to meet building requirements, the


MxPro 5 panels also run Advanced’s AlarmCalm false alarm management software with investigation delays and detailed options for alarm verification. AlarmCalm uses Advanced’s fast hardware, updated config software and optional loop


panel, sprinkler panel and fire and voice alarm panel, were all designed and manufactured by Advanced’s AdSpecials department who worked closely with the client to fulfil a brief for a bespoke solution, both to budget and to deadline. As a UK-first, 22 Bishopsgate will utilise


a specially developed lift-evacuation strategy in case of fire. Responsible for every aspect of installation of the fire system from design to completion, PHF Fire, a division of PHF Electrical, used Advanced for its market-leading networking capabilities, best suited to managing a network of this size and complexity.


0345 894 7000 www.advancedco.com Sealing protection achieves MOD standard


Resiblock has seen not one, but two of its Commercial Sealers specified for use at the new £300 million Defence College of Logistics, Policing and Administration in Worthy Downs, Hampshire. Resiblock ‘22’ has been installed to seal over 2,300m² on


Connaught Road (the road leading up to Worthy Downs Barracks), ensuring that the block paving will remain stabilised under the weight of all footfall and vehicular traffic. Additionally, Resiblock Resiecco was utilised to seal around 1,200m² of pathways, small roads and presentation areas around the College Building.


mail@resiblock.com Latest news, views and more


If you like to be kept informed of all the latest news, views, and promotions for the architectural community, the ADF email newsletters can offer you regular updates straight to your inbox. The weekly Editor’s Choice newsletter includes top news stories curated by the ADF editorial team, while the


monthly CPD Focus and fortnightly ADF Newsletter offer updates on products, services, events, and learning opportunities available from a wide variety of manufacturers and suppliers.


www.subscribepage.com/adf


WWW.ARCHITECTSDATAFILE.CO.UK


ADF FEBRUARY 2020


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124