search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
31


HALFTIME, GERMANY COBE


Danish architecture firm COBE have designed a new multi-purpose building for sports brand Adidas for their corporate headquarters in Germany. The new building, named Halftime, totals 15,500 m2


. As well


as a canteen for all HQ employees, the building contains meeting rooms, a conference centre and a showroom, where the company’s brand ambassadors can stop by to see the latest new designs, collections and ideas. The project features a 8,650-square-metre rhomboid roof structure consisting of V- shaped concrete beams and covered in glass. In fact, a third of the roof consists of skylights, which allows daylight to enter the building throughout. The concrete beams, each 16 metres long and weighing 28 tonnes, add up to a total length of 3.2 kilometres.


BAO’AN BAY TOWER, CHINA JAEGER KAHLEN PARTNER


HIGHLINE PLAZA, NEW YORK SWA/BALSLEY


SWA/Balsley are designing Highline Plaza at Schuylkill Yards, a mixed-use redevelopment adjacent to Philadelphia’s 30th Street Station. The architects said the design for the new public plaza will transform an underutilised surface parking lot into “a vibrant landscape of connection.” Part of a master plan to create a new mixed-used district, the half-acre plaza will be programmed with a variety of elements including outdoor dining, pop-up retail, performances, and other public gatherings. The design is inspired by the site’s rail legacy and industrial heritage, with a “dynamic ground plane” mimicking the geometries of a railyard and interpretive art installations. Highline Plaza is part of Schuylkill Yards’ first phase, which is scheduled to begin construction in 2020.


Jaeger Kahlen Partner is one of the joint winners at the international competition for Bao’An Bay Industrial Investment Tower in Shenzhen, China. The office building is a set of “shifting volumes” that break the tower into a series of terraced stacked blocks. The tower is located in a developing neighbourhood that allows access to Shenzhen Bao’An International Airport and the cities along the Pearl River Delta. The floors of each building volume are connected by spiral staircases, forming “vertically cohesive work environments.” On this project, Jaeger Kahlen Partner worked with Transsolar KlimaEngineering to develop and incorporate several practical and efficient sustainability techniques into the design.


ADF FEBRUARY 2020


WWW.ARCHITECTSDATAFILE.CO.UK


© SWA/Balsley


© Rasmus Hjortshoj


© Jean-Francois Goyette


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124