search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
92 INTERIORS; SAFETY & SECURITY


Advanced’s high rise reputation sees it protect European landmark


G


lobal fire systems leader, Advanced, has been specified on another landmark tall building. Set to stand


at 62-storeys high, 22 Bishopsgate in the City of London will, on completion, become the second-tallest building in Western Europe. The 278m office building will offer 1,275 of high specification office space,


million ft2


as well as eight community spaces, covering over 100,000 ft2


, including an innovation


hub, curated gallery space, fresh food market, gym and wellbeing retreat. Once completed, Advanced will protect both of Western Europe’s tallest buildings, with 22 Bishopsgate being the latest in a long line of London’s most prestigious and iconic skyscrapers specifying Advanced, including the Shard, the Leadenhall Building, the Heron Tower and the HSBC Tower. At the centre of the active fire protection


for 22 Bishopsgate are over 80 networked MxPro 5 panels with graphic display and BMS integration, alongside three special build


Courtesy of Lipton Rogers


panels for the building’s Fire Command Centre, that will form part of the intelligent fire detection network. Advanced’s panels are used alongside Apollo’s Soteria detectors and its networking is widely regarded as the most resilient and scalable solution on the market. It can be expanded up to 200 node networks covering huge areas with complicated cause-and-effect. As a UK-first, 22 Bishopsgate will utilise a


specially developed lift-evacuation strategy in case of fire. The building is separated into


four vertical areas by fire-hardened slabs with a two-hour fire rating separating a floor from the one above at levels 26, 42 and 58. Depending on which of the four vertical areas of the building a fire is detected, workers on that floor and the floors above egress via fire escape stairs to the area below and from there can evacuate via the lifts, safe in the knowledge that these are protected by the slabs above. Responsible for every aspect of installation


of the fire system from design to completion, PHF Fire, a division of PHF Electrical, used Advanced for its market-leading networking capabilities, best suited to managing a network of this size and complexity. Advanced is a world leader in the


development and manufacture of intelligent fire systems. The performance, quality and ease of use of its products sees Advanced specified in locations all over the world.


0345 894 7000 uk.advancedco.com Modern flooring for historic Spanish City dining and leisure centre


The historic Spanish City utilised flooring solutions from Flowcrete UK in its 2018 restoration project that saw its Edwardian features brought back to life. “The Dome” first opened its doors in 1910 and was a hub of activity and interest to the residents of Whitley Bay and visitors alike. Almost eighteen years after its closure, North Tyneside Council has reopened Spanish City and restored it to its former glory, thanks to support from the National Lottery Heritage Fund and its players. Kevin Potter, Flowcrete UK’s Managing Director, said: “With the devil being in the detail, the expertise of Flowcrete UK was called upon to find the ideal flooring solution for the dome area that would merge Spanish City’s early twentieth century heritage with modern building technology.” Over 500 m2


of the semi-dry cementitious Isocrete K screed and Isocrete K Screed HDP


was installed alongside underfloor heating, in order to provide a heavy-duty base for the resin flooring. To pay homage to the twentieth century glamour, 200 m2


of the decorative seamless terrazzo system Mondéco


Earth was chosen in two complementary colours to form concentric circles around the dome. 01270 753000 www.flowcrete.co.uk


Antron®


carpet fibre proves performance and flexibility at Workplace House Antron®


carpet fibre, played its part in this year’s Clerkenwell Design Week, used in six carpet qualities from Christy


Carpets at Workplace House, a collaborative showroom space in London’s bustling Clerkenwell district. Workplace House sees highly-regarded manufacturers and technology companies come together to create an exemplar agile workplace, brimming with innovative workplace design and solutions. For the floors of Workplace House, Christy Carpets has selected some of its most stylish designs, with six of these carpets making use of Antron® Known for rock-solid performance and ease of maintenance, Antron®


carpet fibre. carpet fibre can be found throughout the


showcase space, demonstrating Christy Carpets’ confidence in choosing the fibre for demanding areas such as the main entrance, where making an excellent first impression is key. Stephan Hanke, INVISTA Antron® comments: “The widespread use of Antron®


carpet fibre at Workplace House demonstrates the confidence Christy


Carpets has in the full range of available Antron fibres; from the durability and soil-hiding capability of Antron® carpet fibre up the peerless stain and fade-resistance, soil-hiding and longevity of Antron®


Lumena.” www.antron.eu www.INVISTA.com carpet fibre,


WWW.ARCHITECTSDATAFILE.CO.UK


ADF JULY 2019


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100