[WRE | SPOTLIGHT]


and technical competence in heavy lifting tower cranes for a Project on such a scale. No matter the distance between Turkey and Australia, the crew is always with us whenever we need technical support.” While three bridges and one tunnel serve traffic on the Bosporus, this ambitious project is the first structural crossing of the Dardanelles, providing a new heavy transit alternative for Western Turkey while strengthening economic potential and social bonds for its population. Te 1915 Çanakkale Bridge joins the towns of Gallipoli on the European side of Turkey to Lapseki on the Asian


Marr’s methodology allowed lifting elements weighing up to 60 tonnes, including some 50-tonne weights at the extreme ends of the site.


side and is part of the Malkara-Çanakkale Motorway Project - a 88-km segment of motorway. Te bridge is named in honor and remembrance of the World War One battle that took place between Turkish and Allied forces. On completion it will be the world’s longest span suspension bridge. With a total bridge length of 4,608 meters, a central span of 2,023 meters and a total bridge tower height of 318 meters, the feats of engineering required to complete the construction are staggering. Impressed by Te Men From Marr’s track-record in designing and delivering large scale project lifting solutions on similarly challenging projects in Australia and around the world, DLSY Joint Venture challenged Marr Contracting International Ltd, (a wholly owned subsidiary of Marr Contracting Pty Ltd), to develop a solution that would decrease the construction time and associated risk for the project.


“… FOR US TO WORK ALONGSIDE TURKISH ENGINEERS AND CONSTRUCTION TEAMS ON BUILDING THIS SIGNIFICANT LEGACY PROJECT IS A ONCE-IN-A-LIFETIME OPPORTUNITY.”


With a number of world firsts under their belt, the Marr team worked closely with the DLSY Joint Venture team to develop a solution that, using the world biggest tower crane - the M2480D Heavy Lift Luffer (HLL), could be a game changer for the future of bridge construction.


Marr’s Managing Director, Simon Marr, said “Tis is an exciting project for us – not just in engineering terms but emotionally and culturally as well. Gallipoli holds a unique place in the heart and psyche of both the Australian and Turkish people, and for us to work alongside Turkish engineers and construction teams on building this significant legacy project is a once-in-a- lifetime opportunity, we are delighted to be selected to undertake this demanding package of work.”


Te Men From Marr’s started work on engineering plans in January 2018 and are expected to be on site from July 2019 for an estimated 14 months, with responsibility to: design the crane supports and ties, supply the supports ties and cranes, install and commission the cranes, climb and operate the cranes during the construction of the bridge towers and the dismantle of the cranes on completion of the build. y


Te Men from Marr’s (Marr Contracting) are world leaders in the design and delivery of heavy lift tower cranes and heavy lifting services. With more than 80 years’ experience working on large-scale construction projects in Australia and around the world, their expertise spans the construction, mining, oil and gas, power generation, agriculture and public infrastructure sectors.


WIRE ROPE EXCHANGE MAY–JUNE 2019 25


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85