search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
30 INSIGHTS


What is the loading capacity of the existing structure? As above, buildings have historically been designed with large floor loading capacity, usually 4-5 + 1 kN/m2


, with additional


loading around cores for server space. As IT and advances in remote digital filing become the norm, we are designing to 3-3.5 + 1 kN/m2


. Floorplates can often be extended outwards as well as upwards utilising the redundant structural capacity in the frame and foundations.


What is the structural grid?


Are the columns at a sensible spacing that does not compromise the space, and can be efficiently used by incoming tenants?


Environmental factors


There is significant embodied energy within an existing building. Retaining as much as possible reduces this wastage as well as reducing the transport involved in carting away the old and bringing in the new.


Case Study: Victoria Gate, Woking We originally designed and delivered the original Victoria Gate in 1986 for Norwich Union. The building’s design was pioneering at its time, utilising new techniques in unitised curtain walling and slim efficient construction methods. 30 years later, Scott Brownrigg revisited the building to bring it up to 21st Century standards for the competitive commercial market. Originally appointed to undertake a simpler interior refurbishment commission, it became apparent during the feasibility stages that exploring options to re-use the existing


1980s structure could bring a more attractive longer-term solution for client Aviva Investors.


By bringing the original outboard external column structure inside to extend the floor plates beyond the original envelope, infilling the former courtyard and by adding a new fifth floor, a further 25 per cent lettable space has been delivered for the client. In addition, a strategy for a total visual rebrand for the 63,375 ft2 building was undertaken to appeal to a speculative tenant. The building has now been let to McLaren Automotive.


Nick Ridout is project director at Scott Brownrigg


WWW.ARCHITECTSDATAFILE.CO.UK


ADF FEBRUARY 2019


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132