This page contains a Flash digital edition of a book.
FEATURE SPONSOR


LOGISTICS


OFFSHORE PROJECT SUPPORT MORE THAN A SHIPS AGENCY


Arthur Smith (Grimsby) Ltd has developed over the last decade from a port-based commercial Ships Agent and Freight Forwarder into an offshore project and wind industry support specialist.


KNOWLEDGE AND EXPERIENCE


2016 marks the 80th anniversary of the company which, over four generations, has provided reliable and efficient ships agency, stevedoring and logistics services. Their knowledge and experience has been utilised and adapted on a number of offshore construction and windfarm projects.


The first major windfarm involvement came with being appointed agents for the 145m hotel vessel Regina Baltica on Sheringham Shoal OWF including 24/7 infield support and all aspects for port calls at Harwich including logistics, stores, waste disposal, laundry, container hire and engineering work, from mobilisation to demobilisation. The company’s flexibility, commitment and industry knowledge has been applied to numerous windfarms for a variety of clients. Involvement has ranged from crew movements and PPE allocation for Seajacks on Humber Gateway, ships agency for survey companies to more extensive operations.


TETNEY SEALINE REPLACEMENT


In 2015, the 50 year old oil pipeline from Tetney Monobuoy to Phillips 66’s Tetney Terminal was replaced by Van Oord. With no access from the shore everything had to be supplied via the Humber. Assistance started with Harbour Master Humber liaison, planning vessel activities and beaching the large work barges. Arthur Smith also set up 24/7 stevedoring services and support from a terminal at Royal Dock, Grimsby for more than a dozen vessels used on the project. A complete logistics, storage and ships agency solution allowed both Van Oord and P66 to concentrate on the engineering work at hand and deliver a successful project.


RACE BANK EXPORT CABLING


During 2016 the company supported Jan de Nul on the installation of the export cable for Dong Energy’s Race Bank offshore windfarm. Over 40 vessels have been covered in The Wash, King’s Lynn,


Sutton Bridge, Lowestoft, Immingham and Grimsby. Planning meetings and local Harbour Master liaison have been carried out, and waste disposal, bunkering, logistics, guard vessels, towage and landside crew movements organised. The desire to use the considerable knowledge of the company to bring greater efficiency and reliability to offshore construction and windfarm project logistics has brought further clients this year including assisting DeepOcean at Grimsby on the inter array cables for Race Bank.


Arthur Smith (Grimsby) Ltd COMPLETE SHIPPING AND LOGISTICS SERVICES


Danbrit Shipping provide complete shipping and logistics services to the wind energy sector. Combining experiences of more than 50 years and many wind energy projects, the company aims to support offshore and onshore developers, vessel owners, contractors (EPC’s), installers, fabricators, equipment manufacturers and operators & maintenance (O&M) service providers.


BESPOKE SERVICES


Established for almost 30 years, based on the Humber, also provides bespoke Shipping and Logistics services, including extensive project cargo solutions, ships chartering, project chartering, agency services, stevedoring & port logistics and general/heavy & abnormal load haulage, to clients across the globe within many sectors as well as offshore oil & gas/renewables.


INDUSTRY GROWTH


More recently they have seen an increase in orders from the on/offshore wind sector originating from turbine transportation, installation and O&M, which has resulted in supplying various services ranging from heavy shipping and haulage, to crew changes and vessel provisions and they are ideally located for major Round 3 projects. In addition to project cargo services the company also handles general haulage and have over 100 curtain sided vehicles, within the group, operating around the UK.


Danbrit Shipping


www.windenergynetwork.co.uk


113


HUMBER UPDATE


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116