CASE STUDY - SWINFORD WIND FARM


SWINFORD WIND FARM


CASE STUDY


Jones Bros Civil Engineering was appointed by Vattenfall in 2011 to supply the balance of plant services, including cabling and electrical work, at Swinford Wind Farm, close to the Catthorpe Interchange, Leicestershire.


THE PROJECT


The project involved the construction of 11 2MW Vestas wind turbines with the associated site tracks, hard standing areas and a new sub station.


WORK INCLUDED… • Design and construction of site access tracks including gas pipeline protection works


• Construction of two new S278 highway entrances


• Engineered upfill works to all turbine foundations


• Construction of concrete turbines and crane pad foundations using locally sourced steel and concrete


• Construction of substation building • 6km of cable trenching • Electrical design and installation • Permanent met mast installation • Landscaping and reinstatement


LOCAL LABOUR


Throughout the contract Jones Bros utilised local labour and services as much as possible. This includes hiring of local plant to assist in the construction of access tracks and hard-standings and hiring of local equipment, including accommodation units, pumps and generators.


Huw Jones, Managing Director of Jones Bros Civil Engineering UK, said: “We work across the UK and are passionate about the need to create an economic boost in the communities in which we work.”


ENVIRONMENTAL CHALLENGES An important aspect of the work involved addressing the environmental challenges that come with the construction of the access roads, crane pads and turbine foundations.


Everyone involved in the project was keen that all operations had the least impact possible on the surrounding environment, with extensive environmental and archeological surveys being carried out.


Environmental work included the improvement and creation of new habitats for wildlife, notably great crested newts.


Looking after wildlife on the construction site was also a major priority. For example when trenches were dug to lay cables, they were filled in immediately afterwards to minimise the risk of wildlife falling in.


BACKGROUND


Jones Bros has become one of the UK’s leading companies developing balance of plant services for wind farm developers and turbine manufacturers. The foundations for this expertise were laid when the family firm established techniques for constructing forestry access tracks in mid-Wales during the 1970s.


Since then the company has amassed a great deal of experience in managing the complex logistics of working over large expanses in remote areas. Its engineers have developed a thorough understanding of the special requirements of projects involving the construction of access roads to accommodate abnormal loads, turbine foundations, substation buildings and electrical infrastructure.


LARGEST CONTRACT


Their largest wind farm contract to date involved 60 turbines (140MW), with its on-site batching plant ensuring maximum flexibility and preventing many heavy vehicle journeys. In fact the batching plant proved to be such a great asset that the company has since invested in a second one.


Engineers also constructed a £1m eco- control centre at the site and the entire contract was successfully completed within schedule despite delays caused by the worst winter in half a century.


Jones Bros


100


www.windenergynetwork.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116