PROMOTIONAL FEATURE Gerflor’s Fast Track
Sports Hall Flooring Refurbishment Solutions that don’t cost the earth!
I
n the days of austerity, indoor sports floors that have ‘seen better days’ don’t always have to be uplifted and replaced. You can save money, down time and environ- mental impact by leaving the old floor in place and over
laying it. Gerflor, a leading manufacturer of Taraflex™ Sports Floors,
have recently launched a number of product solutions that can be installed directly over the old sports surface. This can save a small fortune in costs and can be quickly installed minimising facility down time.
A RECENT SUCCESS: GILLINGHAM LEISURE CENTRE
During the recent facility refurbishment it was decided that the sports floor was in need of replacement. Gerflor delivered a specification and a solution that made a huge difference to the local community. The new floor was installed on top of an existing Granwood floor in only 3 days! John Havill, Chairman of Three Rivers Partnership com-
ments: “To think how bad the floor looked before and how it looks now is quite remarkable. Gerflor assisted in the project management of the scheme hugely and the sports hall floor re- furbishment came in on time and on budget”. John Havill also added “Our customers love it, in particular
the badminton club, some even hinting this is the best sports hall they have ever played in”.
Taraflex™ sports floors have been manufactured since 1947
and offer a number of user and operator benefits including optimum user safety, comfort, performance and ease of main- tenance. Taraflex™ is an ‘Approved’ surface by many National and International governing bodies of sport.
Call or email now to take advantage of our
FREE SPECIFICATION ADVISARY SERVICE. Darren Wood – Sports Manager on 07836 366579 or
dwood@gerflor.com David Carter – Sports Specialist on 07850 217290 or
dcarter@gerflor.com
Visit
www.gerflor.co.uk for further information
See How the New Taraflex™ Eco-Fit system compares to a traditional refurbishment
ITEM (based on 594SqM)
UPLIFT OLD FLOOR DISPOSAL OF WASTE
PREPARATION OF SUB FLOOR INSTALL NEW SPORTS FLOOR LINE MARKING (8 Game Lines) PROJECT TOTAL PROJECT TIME
TRADITIONAL SPORTS FLOOR
£ 3, 975 £ 2, 380 £ 3, 524 £ 28, 153 £ 2, 290 £ 40, 322 10 days
POTENTIAL SAVINGS OF UP TO 40%!
NEW TARAFLEX™ ECO-FIT METHOD
£0 £0 £0
£ 22, 692 £ 2, 290 £ 24, 982 4 days
TARAFLEX PAYMENT PLAN*
Total Cost of Project £24, 982
Deposit £5,000
Monthly Payments £347 Term – 60 Months
Previous
Now
Issue 2 2012 © cybertrek 2012
Read Sports Management online
sportsmanagement.co.uk/digital
27
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84