CASE STUDIES


GEA equipped the multi-purpose arena in Berlin with refrigeration technology.


The refrigeration cycle’s main components are the com- pressor, the condenser, expansion valve (high-pressure fl oat) and the evaporator), the refrigerant pumps and the cooling tower.


A peek under the ice. Pumps feed the liquefi ed CO2 the pipes (secondary circuit) in the ice surface.


into


An icy cold for the Eisbären rink – and pleasant temperatures for the fans in the stands


When the Eisbären Berlin aces in Germany’s top ice hockey league and their opponents from Germany and abroad go head-to-head on the ice, the frozen surface needs to keep pace.


G


EA technology ensures a pleasant temperature of up to 21°C for the fans, and because the next game or another


major event is never far away, the ice needs to hold up and must not thaw. After an ice hockey game, construction usually starts right away to set up for a concert, a basketball game or other events. The ice surface then disappears under 1,249 insulation panels for several hours or even days without thawing or deteriorating in quality. This is possible thanks to a real power-play combination provided by engineers, ice masters and the in-house technicians team. CLIMATIC GfKK was the main contractor for the multi-purpose arena project in Berlin. Technical service manager Martin Reichmuth explains the decision to go with GEA solutions and technologies: “It was the equipment’s effi ciency that tipped the scales in GEA’s favor. The overall effi ciency, fl exibility, wide performance range, long service intervals and an extended, best-in- class warranty led to our selection.” But how do the ice masters get the icy surface to fi t precisely and on time? Since the championship in Germany’s top ice hockey league, the DEL, usually begins in September each year, the preparatory work starts in mid-August. The complex process, involving numerous steps, takes almost a week. First, the concrete fl oor of the arena is


prepared. This includes accurately measuring and marking the area as well as cleaning and smoothing the concrete surface to create a level base. Any irregularities or dirt particles must be removed to allow for even ice formation. Today’s refrigeration systems are based on the principle of a closed refrigeration cycle. An NH₃/ CO2


The secondary refrigerant is CO2


cascade is installed in the Berlin arena. , while NH₃


is the refrigerant for the primary circuit. The refrigeration circuit’s main components are the compressor, the condenser, the expansion valve and the evaporator, the refrigerant pumps and the cooling tower. First, the gaseous refrigerant is sucked in and compressed by the compressor, with the heat generated in this process being absorbed by the refrigerant. The heated refrigerant is fed into the condenser, where it cools down at constant pressure. In the process, the refrigerant condenses, becoming liquid. In the next step, the now liquid refrigerant reaches the expansion valve. Through this valve, the refrigerant expands to a low-pressure level, thus reducing the temperature. In the fi nal step, the refrigerant fl ows into the evaporator, where it is returned to a gaseous state. During this process, the heat required is extracted from the surrounding environment, which cools down as a result. So in fact, cold is not being made. It is simply the removal of heat. The refrigeration cycle then


starts again with the transfer of the refrigerant into the compressor.


The interface of the two circuits is the


evaporator/condenser, where the gaseous CO2 which comes from the CO2


and the liquid ammonia is evaporated. Pumps then feed the liquefi ed CO2


into the pipes


(secondary circuit) in the ice surface, where it absorbs heat and returns to the separator partially vaporized. The two circuits work in tandem.


The ice masters apply water mist using hoses


fi tted with fi ne nozzles. The sprayed water is degassed, as normal tap water – with the oxygen and carbon dioxide it contains – would lead to gas inclusions in the ice and negatively impact its subsequent quality. The hoarfrost on the concrete fl oor absorbs the degassed water and freezes into ice. This fi ne water mist is applied repeatedly over several days – ensuring each time that the water can be completely absorbed by the hoarfrost and thus freeze. A layer of ice gradually forms from the hoarfrost. Advertising foils, logos as well as the ice hockey lines and markings are applied between the layers. While these are then covered by a thin layer of ice, they naturally remain visible. At the end of the process, the ice cover is about three and a half centimeters thick, ideal for an ice hockey game. Ice hockey players need a very hard ice surface of -8°C so that the puck really fl ies.


, separator, is liquefi ed


Download the ACR News app today


www.acr-news.com • December 2023 33


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40