Consultee
Environment Agency
Date / Document
East Anglia ONE Scoping Opinion (IPC 2010)
Comment
It is important to ensure that the EIA considers the prevention of pollution during construction and operation of the windfarm to prevent the deterioration of water quality.
Planning Inspectorate
East Anglia ONE Scoping Opinion (IPC 2010)
The East Anglia ONE proposed site lies completely within the former Warren Spring Environmental Research Laboratory marine disposal site. A full assessment of the environmental impacts of the consequences of disturbing this area needs to be undertaken.
MMO and Centre for Environment, Fisheries & Aquaculture Science (Cefas)
8.3 Scope
8.3.1 Study Area 6.
As described in Chapter 5 Description of the Development, the proposed East Anglia THREE is being developed alongside East Anglia FOUR as the second phase of windfarms within the East Anglia Zone. East Anglia THREE would have the same landfall location as both East Anglia ONE and East Anglia FOUR and would utilise part of the East Anglia ONE offshore cable corridor.
7.
The assessment of impacts of the proposed East Anglia THREE project on marine water and sediment quality considers the effects of two study areas:
The East Anglia THREE site: the footprint of the development that resides in the offshore marine environment, including the wind turbine foundations, collector and converter station foundations and inter-array cable routes.
The offshore cable corridor: including the offshore cable corridor to landfall location.
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 8 Marine Water and Sediment Quality Page 3
Clarification should be provided in the final EIA to show that the development of the OWF is not expected to have a significant effect on water quality at any time, with the exception of the increase in suspended sediment concentrations (SSC) detailed.
Response / where addressed in the PEIR
Implementation of standard mitigation would prevent pollution incidents (see section 8.3.3).
Undertaken in East Anglia ONE Environmental Statement (ES) (ERM 2012).
Undertaken in East Anglia ONE Environmental Statement (East Anglia ONE 2012).
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44