This page contains a Flash digital edition of a book.
Table 8.1.Consultation Responses Consultee


Date / Document


East Anglia THREE


Planning Inspectorate


East Anglia THREE Scoping Opinion (The Planning Inspectorate 2012)


Joint Nature Conservation Committee (JNCC) and Natural England


East Anglia THREE Scoping Opinion (The Planning Inspectorate 2012)


Marine Management Organisation (MMO)


East Anglia THREE Scoping Opinion (The Planning Inspectorate 2012)


The potential effects of waste disposal or leakage into the marine environment should be considered within the PEIR. Reference to methods of disposal of waste arising from the construction and operation of the development should also be made.


Where available, more recent data should be used inform the water quality assessment. Further evidence to support the conclusion that no pathway for release of contaminants or associated impact on water quality during construction activities is required.


The East Anglia THREE cable route crosses the former Warren Spring Environmental Research Laboratory. Sampling for contaminants within the surface sediment has revealed no traces of contamination. Continued monitoring of sediment contaminants throughout the development can be scoped out of the EIA process.


East Anglia ONE MMO


East Anglia ONE Scoping Opinion (IPC 2010)


The taking of a small number of water quality samples is recommended during the EIA. This will provide confidence, reassurance and evident that no contaminant re-suspension will be caused by the windfarm development. It is agreed that the likelihood of such contamination is low.


This comment has been addressed within this PEIR chapter.


Comment


Response / where addressed in the PEIR


Further samples have been taken within the offshore cable corridor and within the East Anglia THREE site to inform the assessment.


No action required.


Five surface sediment grabs were collected to provide confidence, reassurance and evidence that there would be no contaminant re-suspension caused by the development of East Anglia ONE.


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 8 Marine Water and Sediment Quality Page 2


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44