This document reference Appendix 5.6, contains an example of an Outline Travel Plan. This document was prepared for the East Anglia ONE windfarm DCO application and is provided here as an example of how the East Anglia THREE equivalent will be set out. This document is version 4 and was completed after the East Anglia ONE hearing stage of the examination. The finalised version will be completed prior to the construction of the East Anglia ONE windfarm.
The Outline Travel Plan considers local community liaison, onshore construction such as site audit, travel plan administration, travel plan targets and monitoring. onshore traffic location separate to onshore construction.