This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
This document reference Appendix 5.4, contains an example of an Outline Traffic Management Plan. This document was prepared for the East Anglia ONE windfarm DCO application and is provided here as an example of how the East Anglia THREE equivalent will be set out. This document is version 4 and was completed after the East Anglia ONE hearing stage of the examination. The finalised version will be completed prior to the construction of the East Anglia ONE windfarm.
The Outline Traffic Management Plan considers the standards and procedures for managing the environmental impact of traffic associated with the construction works, local community liaison, pre and post construction surveys, construction logistics management, road crossings, construction route appraisal and route assessment surveys.
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Appendix 5.4 Outline Traffic Management Plan Page 1