For each activity of work, the project EMP shall identify specific construction work process/aspects, the environmental impact of each process/aspect, the mitigation measure/best practice and the relevant procedure or method of work to be followed.
22
In addition, a number of environmental plans and strategies for construction management relevant to construction arrangements across the project will be prepared and implemented; these are detailed in the sections below and will be attached as Schedules to this OCoCP. As well as being captured by Requirement 27 of the DCO (Code of Construction Practice), certain of these plans and strategies are also individual Requirements in their own right. An outline description of the plans together with relevant references to the CoCP and DCO requirements is provided below in Table 1, and shown in an flowchart in Diagram 1.