This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
150 On-site monitoring would be maintained by SCC and EH, and defined (i.e. fenced off) archaeological sites not given over to haul road construction/cable trenching until a site and records inspection has been carried out.
151 Following identification of archaeological remains, the methodology for excavation would be subject to the agreed Method Statement for Archaeological Excavation. Methodologies regarding excavation, recording techniques, environmental policy, small-finds policy, and treasure are outlined in the methodology for preservation by record (archaeological excavation), see Part 1.11.
Outline Written Scheme of Investigation: Archaeology and Cultural Heritage (Onshore) Rev 01