materials feature | PE100 GPS has produced a


completely new size of PE100 pipe for a UK


water industry project


nents are available locally also meant the piping could be produced quickly, safely and in exactly the right dimensions at the construction site, said Agru. In the past, PVC or GFRP pipes have generally been


installed at such plants. The open-installation Agruline piping system, which has outer diameters of up to 250mm and SDRs of 11 (PN 16) and 17 (PN 10), consists of prefabricated isometries that are connected by heating element butt and socket welding. The high precision of the isometry guaranteed quick installation at the reverse osmosis plant. The Agruline piping system has an operating


pressure of 4.5 bar. World first


Agru pipe adapted itself to fit the exit angle of a borehole, for a supply project in Germany


Agru has also claimed a world first by installing PE100 pipe – with an outside diameter of 1400mm – using horizontal direct drilling (HDD). The Agruline PE pipelines were installed trenchless, in a twin-pipe culvert underneath the Spree river in Germany. The pipe is used to transport groundwater – as well as water from a nearby open cast coal mine. These pipes were originally made from GRP, but these had undergone complex repair – and could, at a later date, suffer further damage. As the coal mine can only operate for a few days without the pipeline – which is used to lower the water table – the switch was made to PE100. A new installation using HDD with pipes made from PE 100-RC was the most economic and easiest solution to implement. The pipes are permanently resistant to corrosion from the mine water transported here. Given their high flexibility, wash borings with small installa- tion radii are also possible. Any ground subsidence that occurs can be absorbed by the permissible deformation of the pipes without the danger of damage as a result of cracks or breaks.


The benefits of the HDD method in this case include the relatively minor impact on nature and the environ-


ment and the least amount of underground construction work requiring drainage. Being around 6.5m below the river bed meant that piping in the section of the wash boring would need a wall thickness of SDR 17.


Superior performance Performance Pipe, a division of Chevron Phillips, has introduced a new polyethylene (PE) pipe which it says has superior properties to PE4710 pipe – the US equivalent to PE100. These capabilities include abrasion resistance in


industrial and energy applications such as mining, oil and gas gathering, produced water, liners, power plants, dredging and pumping. DriscoPlex 4800 series PE pipe is made from medium-density polyethylene (MDPE) that conforms to ASTM F714 and D3350. Testing has shown that the pipe provides at least 30% greater abrasion resistance compared to other HDPE pipes tested – including PE4710.


It is also four times more resistant to slow crack


growth than the PE4710 requirement, and offers less stiffness and greater ductility. Combined with reduced weight, this aids in field handing and installation, says the company. The company adds that it has the same fusion


parameters as PE4710 pipe, while being around 2% less dense.


Online assistance The PE100+ Association has developed an online guide to help civil engineers identify the most suitable trenchless methods for installing PE100 HDPE pressure pipe.


The ‘No-Dig Technical Guide’ covers new installation


and rehabilitation of existing water and gas pipelines using trenchless methods. It was developed by the PE100+ Association in


24 PIPE & PROFILE EXTRUSION | April 2017 www.pipeandprofile.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58