search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
PRODUCTION • PROCESSING • HANDLING


Hoses connected to CALM buoy configuration


RESEARCH, TESTING AND DEVELOPMENT In all scenarios, testing is required to qualify each solution according to different standards. Trelleborg’s R&D team routinely becomes involved in the earliest stage of oil & gas projects to cooperate with its customers in defining the most appropriate technical solutions for the targeted application and design life. Traditionally, R&D departments may not have been expected to play such


Vertical connection of floating hoses


an active role. However, it is becoming increasingly vital for these teams to consult on each project to ensure truly customised solutions. In configurations such as conventional


buoy mooring (CBM) in water of depths up to 20m, OCIMF tests based on GMPHOM 2009 guidelines will be required – the standard issued by oil companies to provide technical requirements to ensure the satisfactory performance of flexible bonded hoses


commonly used at offshore moorings. Hydrodynamic analysis is conducted as necessary, taking into account how a qualified hose design will function in conjunction with its specific properties, performance expectations and the environment within which it will function. In more challenging conditions,


particularly in deep water, or in use with challenging configurations such as the Chinese Lantern, GMPHOM 2009 guidelines are not always sufficient to guarantee an understanding of the capability of a hose system to withstand the static and dynamic loads that occur on offshore terminals. In this instance, the API Spec 17K (specification for bonded flexible pipe) is used, as it considers requirements regarding design methodology, characterisation of the material, and hydrodynamic and fatigue analysis. In these instances, high fidelity finite element models (FEM) for each specific hose construction are created, enabling a precise prediction of hose behaviour, including specific characteristics and limitations. Following this, the fluid


www.engineerlive.com 23


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56