[RIGGER’S CORNER]
4 POINTS for Connecting Rigging Blocks and Lines for
a Suspended Work Platform
BY MIKE PARNELL, PRESIDENT OF INDUSTRIAL TRAINING INTERNATIONAL
WWW.ITI.COM
4
T ings to Consider When Connecting Rigging Blocks and Lines for a Suspended Work Platform (adjacent to the face of a building or structure).
Working with a crew recently was a reminder about how easy it is to get rigging hardware fouled and lose a fi nger trying to free it. We were rigging up the vertical lines needed to support a self-powered work platform. T e hoist used to lift the lines hooked into either a block shackle or thimbled wire rope eye, depending on the line being rigged. Once hoisted to the upper connection point, a shackle pin passed through the suspended shackle or eye. Slowly the hoist hook was lowered to allow the lines to be supported by the upper rigging. When the work platform tasks were completed, the rigging process would be reversed in order to get the suspension rigging and lines back down to the ground. T is transfer process can go well or
disastrously depending on the attention to details. T e following are just a few helpful hints that can lower the risks associated with transferring tensioned rigging. T ough the actual load weight may be less than 1,000 lbs., its dropping can cause injury, death or signifi cant equipment damage.
1. While hoisting the rigging (blocks and lines) for connection, using a locking style hoist hook can help avoid hook fouling. T e standard hook tip can snag on objects, suspended lines or rigging blocks and hardware during the lifting and positioning process.
2. Using an oblong master link as the transfer hardware provides a large arching curve at each end for connection. Picture a rigging block being hung to accommodate a 2-part line to a suspended platform. Its upper connector is a swivel shackle. If a master link is pre-placed into the block shackle, it can serve as an easy-to-access rigging suspension point. A master link will rotate 20-30 degrees left/right in the block shackle bow, allowing for best fi nal alignment.
3. Consider using a short chain sling (2’-4’) with a locking style hook at each end, to “jump” between the upper dedicated suspension point and the hoisted rigging. T ese are easy to connect/disconnect and eliminate the need for handling shackles/pins over open spaces. Remember, the chain sling and all rigging need to be rated for the
maximum intended load of the work platform, its occupants, tools and materials.
4. Caution should be exercised when de-rigging. T e hoist hook needs to be properly seated before it takes tension. While de-tensioning, if a suspension shackle has been unloaded using the hoist, it should be removed with great care. Fingers can be lost if the hoist is “adjusted” up or down during the removal process. Sounds obvious, doesn’t it? If there is one person dealing with the connection and one person working the hoist, there are two brains at work, which might not be synchronized. Communication is absolutely critical during the entire rigging activity, but even more so when installing or disconnecting rigging hardware.
Plan, communicate, execute, communicate, review and communicate. ❙
80
MARCH-APRIL 2012
WIRE ROPE EXCHANGE
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84