Feature Energy Management Is Germany leading the way in biogas?
Having introduced the Lipp tank system for anaerobic digesters to the UK, BCI Process wanted to check that we are not missing a trick when it comes to the latest biogas power generation equipment and techniques. Therefore, the company went to check on a new installation at a farm in Germany
T
he main digester tank in a farm system from BCI can be built to the specific requirements of the client, with a diameter anywhere between 3m and up to 40m. The digester and other storage tanks are built from Verinox, a special combina- tion of stainless steel interior and gal- vanised steel exterior, which has been developed and patented by Lipp. Andrew Shedden, European sales and marketing manager at BCI Process commented, “There is a lot of innova- tive design, materials and technology used to create these tanks so we wanted to make sure the UK systems were being constructed in exactly the same way and giving the same yield figures as the German installs.”
Step one
The first job was to create a detailed layout of the entire plant based on the client’s criteria. This design advocated the single stage digestion process, which allowed for a shorter dwell time for the feedstock in the digester. The smooth stainless steel interior of the tank is a major advantage over tradi- tional concrete designs, making agita- tion much easier as well as avoiding any build-up of material on the tank walls. The project began with the founda- tions being laid down, and then the equipment required for creating the tanks is installed on and around the foundations. The creation of the tank uses a process which requires very few nuts and bolts and much less time than a traditional storage tank. The Verinox material arrives on-site as a large roll of sheet metal, less than a meter across. This is fed into a series of rolling machines positioned around where the base of the tank will be. The rollers start to form the tank by folding the lower edge to a certain profile, then, as the leading edge completes the first lap, the lower edge is folded together with the top edge of the next layer. This creates the first ‘ring’ and as the tank is rotated by the rollers so more rings are added and the tank grows. The two edges are folded together with a sealant in such a way that a gas tight seal is produced as well as a smooth internal surface. The external fold forms the structural strength of the tank, allowing it to be self supporting.
28
Once the tank reaches about two metres in height, the top ring is cut level and the roof is installed. At the same time a gas hood can be installed in the digester to capture the biogas before it is piped away to be burnt or stored. As the tank continues to gain height, any pipes or valves that are required can be installed from ground level rather than using access equip- ment, which would be the case in a conventional tank build. In addition, the thickness of the tank walls can be
adjusted during the construction process providing, for example, 1.5mm in the top section with 3mm in the bottom sections. This means that the material costs are minimised while the tank strength is maintained. In this project the design called for wall heating to be installed, which could also be done as the tank was formed. The hose drums were set-up next to the tank and as it rotated so the hose was pulled off the drums and could be fixed to the external tank wall, again all done from ground level. Once the design height has been reached, the bottom edge of the tank is cut level and the rollers are reversed, which lowers the finished tank into position on the foundations, where the ground fixings are installed. This allows the insulation and exterior cladding to be installed along with the pipe work, valves, pumps and agitators.
On time and on target
The whole project was completed on time and on budget, with the com- pleted plant capable of producing 570KWh of electricity, sufficient for 80
MAY 2013 Automation
Above and below: the Tannhausen farm in Germany is a mixed enterprise with both arable and livestock production - the system was
designed to match the substrates produced by the farm
households. Shedden continued, “This is within the target yield of our installs, although the feed-in materi- als, temperature and process decisions also all play a large part in maximising the end result. We have to select between a single- or two-phase diges- tion process for example - single-phase is typically faster, but higher tempera- ture, so it is really about matching the install with the available materials, volumes and space available.” Shedden is responsible for introduc- ing the system to the mainstream UK market. He concluded, “We have been installing food and waste grade pipework, vessels and tanks for over 30 years and the first time we saw one of these containers being erected over in Germany we just knew we had to supply it in the UK. The tanks are fast to put up and light years ahead of some traditional panel designs in terms of integrity and longevity.”
BCI Process
www.BCIProcess.com T: 01535 657 585
Enter 211
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52