This page contains a Flash digital edition of a book.
PROJECT FOCUS RELIGIOUS 4” rib


POWER PLANT PAPER MILL


Box Beam LAGGING & SHEETING WE HAVE THE SOLUTION! 4.2 Corr 4 7/8 V-Beam


Temple Sinai, Oakland, Calif. Temple Sinai is the oldest and largest synagogue in the East Bay. The building program for the syna- gogue included 18,800 square feet of new construc- tion and 9,865 square feet of renovation. Three jewel-like elements—the chapel, the community living room and the library—are wrapped in 6,000 square feet of 1-mm folded VMZINC PIGMENTO Green zinc double lock standing seam panels from Umicore Building Products USA Inc. Exposed steel elements are featured in the clerestory glazing of the chapel, the circulation’s spine colonnade and in its three-story glazed walls. The metal-clad walls and ceiling form a continu-


5.33 V-Beam Better Products • Better Service • Better Results


Creative Building Supply PO Box 299 • Lakewood, NJ 08701 P: 732.367.6333 • F: 732.367.9568 www.cbssheetmetal.cominfo@cbssheetmetal.com


ROOFING • SIDING • ACCESSORIES • TRIM • DECKING • GALVANIZED & PAINTED PRODUCTS • PANELING circle #17 on reader service card


ous band that in the chapel is inspired by the Jewish tallit, or prayer shawl. The living room and library round out the other foundations of Jewish life repre- senting community and study. Copper was originally planned for the project, but the city of Oakland is moving towards a ban on architectural copper due to copper emissions and run-off into the San Francisco Bay. As a result, tinted zinc was chosen. The end result is a facility that mimics the


Western Wall in Jerusalem. The circulation spine is the same length—187 feet—as the exposed section of the Western Wall. There is a digital installation em- bedded in the wall that displays electronic text from random passages of the Talmud, enabling visitors to contemplate ancient text and its commentary.


 CHANGER GAME


    


"Cutting" Edge Technology


 ST3 to ensure quality”


20 year warranty is available.


No Pre-Drilling Required.


No Pre D No Pre-Drilling


Fast Penetration HSS Self-Drilling Sharp Point.


Fast PFtPen t etrati n tion


CALL TODAY FOR DETAILS 1-800-352-4864


circle #18 on reader service card 50 METAL CONSTRUCTION NEWS December 2012


Owner: First Hebrew Congregation of Oakland, Oakland General contractor: Oliver and Co., Richmond, Calif. Architect: Mark Horton Architecture, San Francisco, and Michael Harris Architect, San Francisco Installer: Peterson Sheet Metal, San Ramon, Calif. Metal wall panels: Umicore Building Products USA Inc., Raleigh, N.C., www.vmzinc-us.com, Circle #43


COMING IN FEBRUARY 2013


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68