COLLEGES AND UNIVERSITIES


Minneapolis Technical Community College Helland/Whitney Hall, Minneapolis The new student center features 21,000 square feet of renovated space along with 16,000 square feet of new construction. The project combined the Irene H. Whitney Fine Arts Center with the Helland Student Center, to create an additional 5,416 square feet of usable space for the students. Sixteen-gauge AC- 3000ST stainless steel panels with a #4 brush fi nish from Quality Metalcrafts LLC/AMERICLAD line the entryway of the new Fine Arts Center. The panels wrap around into the interior to create a dramatic focal point for both the center’s exterior and interior. Quality Metalcrafts/AMERICLAD’s 16-gauge AC-10ST stain- less steel column covers with a #4 brush fi nish line the exterior of the student center and are also incorpo- rated on all three fl oors of the interior of the center. Stainless steel was not the fi rst choice for the


metal panels, however, stainless steel allowed Arme- tex Inc. to fabricate the complex geometric panels found throughout the center. Stainless steel is an ideal choice for both the interior and exterior design of the center. Known for its long-term durability and sustain- ability, as well as its aesthetic values, stainless steel blends perfectly with the overall design to create a progressive, modern image that will last a lifetime.


Architect: LHB Architects, Minneapolis Fabricator: Armetex Inc., Maple Grove, Minn. Metal panels and column covers: Quality Metalcrafts LLC/AMERICLAD, Rogers, Minn., www.americlad.com, Circle #54


WE JUST IMPROVED ENERGY EFFICIENCY IN METAL BUILDINGS.


2007 AGAIN. 1994


ELAMINATOR® Insulation System


Commercial 1996 NAIMA 202-96


Certified Fiber Glass Metal Building Insulation Standard


Energy Calculator


2010


OptiLiner™ Banded Liner System


At Owens Corning™


we’re always looking for new


ways to improve energy efficiency in metal buildings. We started by making roof insulation faster and safer to install with the ELAMINATOR®


Insulation


System. Then we helped drive the development of the NAIMA 202-96 Certified Fiber Glass Metal Building Insulation Standard, ensuring post-lamination


Shown: OptiLiner™ Banded Liner Roof System Roof Sheet


Bottom Layer Unfaced Insulation


Top Layer Unfaced Insulation


Fabric Liner Banding


R-values. Next we developed a Commercial Energy Calculator to demonstrate the energy cost savings benefits associated with higher levels of insulation. And now, with our OptiLiner™


Banded Liner System,


you can fill the metal building roof and wall cavities to achieve maximum thermal performance. What will we think of next?


So what are you waiting for?


Go to www.bandedliner.com or call 1-800-GET-PINK. THE PINK PANTHER™ & © 1964–2012 Metro-Goldwyn-Mayer Studios Inc.


® All Rights Reserved. The color PINK is a registered trademark of Owens Corning. ©2012 Owens Corning. July 2012 METAL CONSTRUCTION NEWS 47 circle #22 on reader service card


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68