contents HOSPITAL BUILD 2011 ISSUE 4
06 NEWS A roundup of regional and international news, developments and research
10 HOSPITAL BUILD EXHIBITION Hospital Build has gone global!
12 INVESTMENT A snapshot of the GCC healthcare industry today
16 PLANNING The need for flexibility in healthcare infrastructure planning
20 MANAGEMENT Extreme facilities management at American Hospital Dubai
26 PLANNING Flexibility is key in hospital design
30 CASE STUDY RAK Hospital – the path to the best healing environment in the Middle East
32 DESIGN Why hospitals designed for children need to be special places
38 CONSTRUCTION Modular wiring systems could be the future for electrical and power installation in hospitals
42 CASE STUDY Al Jalila Children’s Speciality Hospital - Winner of Hospital Build 2011 'Best Sustainable Hospital Project' award
44 DESIGN Why evidence-based design is here to stay
Hospital Build Issue 4 2011 03
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48