LONE RANGER
PAINTED HILLS HOUSE
Mitchell, Oregon Designer: Ted L. Clifton, Zero-EnergyPlans.com, Coupeville, Washington
Builder: Kirby Nagelhout Construction, Bend, Oregon
Conditioned Space: 1,002 sq. ft.
HERS Rating: -15


 


A new ranger’s residence at John Day Fossil Beds National Monument marks the first National Park Service house in the United States to achieve net-zero-energy.


Completed in December 2010, the home cost about $200 sq. ft. in hard costs.


Home designer Ted Clifton of Zero-EnergyPlans.com, carefully selected high-performance products. For example, he specified structural insulated panels (SIPs) from Big Sky R-Control, which make the home very tight--a total of about 1.2 air changes per hour at a pressure of -50 pascals. The concrete slab is fully insulated with rigid foam to R-20. There’s an additional R-10 of foam insulation at the perimeter of the slab, down to 2-ft. depth.


“The house is clearly out-performing our expectations thus far,” Clifton says, “producing and returning to the grid almost three times as much energy during the day as it draws at night, even during the cold winter months.”


The ductless mini-split heat pump has a heating seasonal performance factor (HSPF) of 10.1. This system doubles as a low-energy air conditioning system for swing seasons. Fan-Tech add-on units provide high-efficiency particulate air (HEPA) filtration and heat recovery ventilation (HRV).


Other energy-saving features include triple-glazed low-E windows with U-values of .20 and a solar heat gain coefficient approximately .25. The home’s insulated fiberglass doors offer a U-value of .16. A solar hot water heater and drain-back system work in tandem with a high-efficiency 80-gallon storage tank.


The home is fully solar-charged, with 5.6 kW of PV panels, along with a solar hot water system. The 24 PV panels generate about 7,000 kWh of power annually. Excess solar electricity charges the Polaris EV LSV electric utility vehicle, which the ranger uses to drive some 5,300 miles each year. Additional spare power will energize a nearby information kiosk.


“This was the number of miles our initial calculations showed we could operate a Chevy Volt in one year using only the surplus power of the initial 24 panels,” says Clifton.

Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76