BOILErS, PumPS & VALVES


SEEPEX back miXing tEchnology incrEaSES SludgE throughPut


water and recycling services to over six million domestic customers, processing over 142,000 tonnes of dry solid sewage sludge in 2020-21 to generate 115GWh of bioenergy. The Cotton Valley Sludge Treatment Centre


A


(STC) is one of Anglian Water’s ten main STCs where sludge is dewatered and treated anaerobically to produce bioenergy. In 2008 an advanced digestion Thermal Hydrolysis Process (THP) was commissioned to speed up the anaerobic digestion process. As part of an upgrade a sludge handling facility was designed to handle approx. 160 tonne a day of imported dewatered sludge from satellite works.


long Standing ProblEmatic aPPlication Progressive cavity (PC) pumps (not SEEPEX) were installed to back mix the dewatered sludge and pump it into the THP. The two pumps were costing overall circa £100K per annum due to rotors and stators change every three to six months. Their inability to transfer no more than 3.5m3


/h (bottleneck and limiting


idEal Solution This selection of control valve is well-matched for decentralised process automation and offers excellent sealing properties as well as valve status feedback via LEDs on the pneumatic control unit itself. Together with the use of chemically-resistant materials in its construction and proven IP ratings, the Bürkert control valve assembly is ideally suited for applications in the food and beverage sector. using planned downtime in production, the


plant initially installed 16 Bürkert control valves, with a further 16 larger control valves being installed on a similar application. The senior reliability engineer at the plant comments:“These new valves have proven to be easy to install and a great improvement in terms of reliability. Their introduction has contributed to an improvement in machine up time at our facility and their high cycling ability makes them well-suited to wide range of applications in the plant.”


bürkert Fluid control Systems www.burkert.co.uk


gas production) meant the site was not able to meet the design criteria limiting the amount of imported raw cake being handled to only 120 tonne per day. Additionally, prior to maintenance, the silo had to be emptied to allow the pumps to be worked on, but also cake imports from satellite sites had to be diverted whilst work was carried out resulting in substantial logistical costs. SEEPEX was invited to survey the site based on their vast experience in pumping and mixing dewatered sludge within Anglian Water’s water recycling treatment sites and sludge treatment centres. Leigh Thornley, engineer for SEEPEX, says: “We took pride in Anglian Water coming to SEEPEX with the opportunity to resolve a long standing problematic application.”


cuStom-madE SEEPEX was asked for a complete turnkey package which included the removal of the existing pumps which were installed under a 7m high silo. The new pumps required custom made hoppers which were 5m long to fit under the existing silo, and being able to handle 5.5m3


nglian Water is the largest water company in England and Wales by geographic area, supplying


dimensionally identical hopper to fit within the same footprint of the original pumps whilst delivering over 55 per cent increased throughput capacity from 3.5m3


/hr to 5.5m3


/hr.


SEEPEX BTES range pumps are designed to fit under silos, have custom made hoppers to suit the application and additionally incorporate an isolation devise to enable maintenance of the pumps to take place whilst sludge is left in the silo.


FirSt-timE Fit Due to the complexities of replacing the existing pumps and the restricted space, the SEEPEX Service Team carried out 3D modelling of the working area to ensure the pumps would fit first time. Over a two week period, the old pumps were removed and the new pumps installed all within the agreed project timeline.


FlEXibility to mEEt Production dEmandS Prior to the installation of the new pumps, Anglian Water were processing approximately 120 tonnes per day of imported sludge cake with both pumps running. With the new pumps installed, the customer is now able to exceed this by 50 per cent (from 120 up to 180 tonnes) whilst maintaining the same footprint and motor size. The new SEEPEX pumps offer ample


flexibility to meet the site’s production demands at lower speeds, which has a direct impact on reducing spare parts consumption. Since the pumps have been installed, no spare parts have been used and the service life has considerably exceeded that of the previous pumps. “Due to the reliability and performance of


/hr of


16 per cent DS sludge which had been back mixed within the pump from 25 per cent DS and transfer this approx. 60m. Part of the SEEPEX solution was to offer standardisation of pump size with other sludge treatment centres within Anglian Water resulting in commonality of spare parts.


Productivity incrEaSEd SEEPEX supplied and installed two custom- made pumps from their BTES range with a


the new SEEPEX pumps there is an increase in uptime of the cake import facility at Cotton Valley,” explains Luke Fish, production manager at Anglian Water. “This has not only allowed us to increase the sludge throughput on site and therefore generate more biogas but has also given us significant savings in logistics and raw cake storage costs. “Thanks to the capabilities and proven


expertise of SEEPEX in cake pumping, installation and management of turnkey projects, we were able to deliver a complete engineered solution for Anglian Water from the initial consultation, site survey, start up and commissioning to continued after sales and service support.”


SEEPEX www.seepex.com


FACTOrY&HANDLINGSOLuTIONS | JuNE 2021 33


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58