News: Rochester Electronics End-of life is not the end-of-line
In this article Ken Greenwood, Rochester Electronics’ technical sales manager EMEA, discusses how companies can partner with authorised sources like Rochester Electronics to manage obsolescence
W
hen long term product availability is vital, companies need to ensure a reliable source of components, even
after the component is made obsolete, and plan to manage obsolescence strategically. Failing to do so could lead to: ● Line-stops ● Unnecessarily large financial commitments tied up in Last-Time-Buy stocks
● Long-term storage costs ● Forced product redesigns ● Premature product EOL and reduced service lives.
How can customers minimize the impact of component discontinuations? 1. Obsolescence management starts at the design phase
Poor component selection in development can lead to premature product redesign and re-qualification. Lowest cost may not be best choice for long-term supply.
Few questions you should ask your supplier:
● What are the OCM commitments to long- term availability?
● Can the supplier demonstrate a controlled transition process through the EOL and into long-term authorized supply?
● Are the heart-beat components of your design; the software packed Microcontrollers, FPGAs, or ASICs comprehensively documented?
● Can the true design files (VHDL, Spice- Models, Test-Vectors) be retained and archived at the design phase to offer a chance to rebuild if the unexpected happens?
2. Understand the total cost of obsolescence
Component obsolescence is not just a purchasing problem to be addressed as an afterthought. Does the project plan need to include anticipated product redesigns during its life? How are the costs of component storage accounted for? How will obsolescence impact on after-sales service commitments?
6 October 2022
3. Plan for obsolescence and resource the management of it If your equipment has a long qualification, production, or in-service life you will face component obsolescence. Preventative planning by purchasing, component engineering, design, and program management can reduce or eliminate the cost and risk.
4. Proactive monitoring of component lifecycles
Regular component monitoring allows a user to anticipate problems before they occur. There are some excellent tools such as I.H.S Parts Intelligence and Bill of Materials (BOM) Intelligence, which track a component’s lifecycle, lead-time, and specification changes.
5. Ensure you are aware of product discontinuation notices (PDN’s) There are many component management databases which can provide you with
Components in Electronics
a PDN notification to highlight any PDN which affects your products.
6. Last-Time-Buy; What to forecast? LTB orders are inevitable, but a supplier with an established EOL transition partner offers the chance of risk-free ongoing authorized stock and production if demand rises, redesigns are delayed, or in-service commitments are extended.
7. Purchase from authorised sources There is a common misconception that once the original manufacturer stops making a component, the grey market sources are the only option for supply. This is far from the truth.
The risk of counterfeit and inferior
products from unauthorised sources represents a significant risk to production yield and failure rates (MTBR). Inferior or substandard “testing” by unauthorised 3rd parties gives a veneer of confidence that this can be accurately tested. In truth, the testing is a poor imitation of the original manufacturer’s test processes. Authorised sources, such as Rochester Electronics, receive their stock exclusively from the original manufacturers, therefore Rochester can offer the original warranties and guarantees. Increasingly Rochester is also able to offer ongoing licensed manufacturing solutions from known- good-die and test products according to the original test procedures. Rochester produced parts are current date coded with no solderability risk and are marked with the original manufacturer’s part numbers, 100 per cent compliant with the original specification.
www.rocelec.com
www.cieonline.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62