OIL & GAS OPTIMISING PUMP ASSETS


Offshore platforms present considerable challenges for pumping equipment [Source: Shutterstock - Oil and Gas Photographer]


The Equinor platform is benefitting from Sulzer’s rapid repair and pump manufacturing service


injection pumps are used to increase the speed of oil recovery. These high energy pumps need to deliver reliable performance from day one, so when a Norwegian offshore platform needed expert support to repair two pumps, it called on Sulzer’s design and manufacturing expertise. Oil and gas still continue to form the


O


building blocks of our everyday essential items. As these resources become more difficult to reach, oil producers need to optimise the efficiency of their process, a task supported by Sulzer. The oil platform has operated two BB5


water injection pumps for over 10 years, but they have suffered from rapid wear and high vibration. The original equipment manufacturer (OEM) had delivered several upgrades but there was little improvement in either performance or reliability. There were also long periods of time when there was no water injection capacity, which had a serious impact on oil recovery rates. To help resolve this, the operators decided to approach Sulzer for a solution. Equinor, the operator of the platform, has


a framework agreement with Sulzer for the repair and modification of pumps. The initial discussions led to an offer to investigate the spare pump cartridge, which had also exhibited the same symptoms of vibration. Sulzer took the cartridge to the Stavanger Service Center and dismantled it. They discovered that the main shaft had rotodynamic issues, which caused the vibrations, and had been an issue from new. To restore the water injection capability of the platform with minimal delay, Sulzer


32 APRIL 2021 | PROCESS & CONTROL


ffshore oil fields need to optimise productivity and remain profitable, which often means that water


suggested, in the short-term, that the cartridge should be replaced with a hybrid component. This would fit exactly into the existing barrel of the pump on the platform and enable the first pump to operate. The pump in question was not


manufactured by Sulzer, but this wasn’t a problem, as the company can work with equipment from any manufacturer. Over the next six months, the new hybrid cartridge was manufactured. Together with the onsite maintenance provider, Sulzer engineers installed and commissioned the water injection pump and returned the platform to normal operations. In the meantime, Equinor had taken the


decision to replace both of the original water injection pumps with new assets designed and manufactured by Sulzer. The new injection pumps would be installed during separate, planned maintenance windows. The projects were carefully coordinated to ensure the pumps were delivered on time, together with other auxiliary components, to meet the installation program set out by Equinor. Oddvar Holta – project manager for Sulzer,


said: “The greatest challenge has been the very short delivery time on the hybrid cartridge, which would normally have taken 10 months. We have managed to streamline this


The rotor from Pump B being prepared for balancing


process and meet the objectives of our customer, getting the water injection pump up and running on time.” However, the story continues; having


manufactured the new pumps to match the specifications of the original components, and with the first pump installed, a change in site conditions prompted the decision to reduce the operational head of the new pumps, to reduce energy consumption and CO2 emissions. This required the pumps to be de-staged, which meant removing four impellers of the original eight in cartridge A and two impellers in cartridge B. The design engineers at Sulzer’s site in Leeds


created the necessary drawings for the transition tubes, which were manufactured at the same site. Once complete, engineers from Sulzer travelled to the platform and removed the impellers that were no longer required and installed the new components. Pump A achieved a power saving of 2 MW,


which equates to 5’536 tonnes of CO2 per year. Similarly, Pump B’s power consumption was reduced by 1 MW, saving 2’768 tonnes of CO2 every year. A senior engineer for rotating equipment at


Equinor, said: “Once the project was complete, we called the Leeds Service Centre to speak with the manager of the retrofit program, Peter Irlam. The fact that the pumps were finally operating without any issues, and that the re-rate program had delivered considerable energy savings as well, meant that we were completely satisfied with the whole project.” Peter Irlam recalled: “This was a great example


of how Sulzer can help a customer troubleshoot an issue and provide a solution to get them up and running. These pumps are important to the productivity of the platform, so installing two new components, designed specifically for this application, will offer much-improved performance for the future.”


Sulzer www.sulzer.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64