DATA CENTRES


the key areas of prioritization for Green Mountain is sustainability. As the installation of the grooved system avoids toxic fumes and gases and is produced in a production facility which uses 90% recycled material, the solution fitted our company’s sustainability efforts seamlessly.” noted Gyland.


Overcoming installation challenges


Sig Halvorsen was the contractor tasked with installing the cooling system in the Green Mountain facility. Their employees are familiar with grooved pipe joining solutions, particularly within


BSEE


data centres. Frode Horpestad, Operations Manager at Sig Halvorsen, who worked on the Green Mountain installation, stated that the pipe joining system allowed his team to overcome some of the site’s installation challenges and even cited these solutions as an aid in winning additional projects.


“It is a simple system to learn and has simple check methods to ensure proper installation. Our employees also received close follow-up from the manufacturers’ representatives on the construction site if required – so it has worked very well. Using a flexible and robust technology


has many advantages, for example utilising this pipe joining system allows us to use the same crew on every construction site, and we do not require certified welders for joining the pipes.” Considering the internet wasn’t invented until several years after the Stavanger NATO facility was built, it is safe to assume the engineers of the time never foresaw a day where the location would become a world renown data centre. But as it turned out, the safety and security of a mountain, with a nearly unlimited hydro-power supply and cool climate, made for the perfect location.


Read the latest at: www.bsee.co.uk


BUILDING SERVICES & ENVIRONMENTAL ENGINEER MARCH 2020 13


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50