search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
MAINTENANCE, REFURBISHMENT & REGENERATION


Rethinking maintenance is key to enhancing commercial resilience


Production, process, and plant managers operating across various industries have been urged to rethink their approach to heat exchanger maintenance following updated insight from a new industry whitepaper


T


he message comes at a pivotal point for industry, as increasing energy costs, aggressive competition from overseas, and decarbonisation targets risk limiting industry recovery.


In particular, high-energy users are being


warned that running key equipment to failure will result in additional costs in the form of equipment repair and poor efficiency levels. To provide practical guidance, global engineering company, Alfa Laval, has launched the whitepaper Taking the Heat – which aims to make proactive maintenance of plate heat exchangers (PHEs) a priority for manufacturers. According to the report, poor maintenance of PHEs across industry plays a major role in increased global carbon emission levels. Although viewed as ‘one piece of a larger puzzle’, without proper servicing and maintenance, the risks of production line failure, low levels of output and unsightly balance sheets are dramatically increased for businesses. Relying on reactive maintenance not only perpetuates a false economy but increases the risk of unpredictability in machinery and costs. Remarkably, an academic report from 2013 found that around 15% of all factory maintenance costs are credited to heat exchangers, with half of that figure due to fouling.[1] A report from OneServe also found that machine downtime is costing manufacturers in excess of £180 billion each year.[2] Experts at


Alfa Laval say taking a ground-up approach to PHE maintenance could drastically lower the chance of line failure and downtime. PHEs are also


commonly specified years ahead of becoming fully operational within a plant, making Alfa Laval’s case for energy-hunting and lean manufacturing even more pertinent. Energy-hunting uses


calculations to estimate energy savings and aims to find new ways of reusing waste energy by changing the cleaning and maintenance program or updating configurations. The report continues to highlight the measures businesses can implement to achieve lean manufacturing and a proactive maintenance schedule. Rachel Bridges, managing director at Alfa Laval says: “Now is the time for renewed focus on effective maintenance strategies, not only to make the most of installed assets, but also to correct the course as commercial resilience is stretched to its limit. We project there are thousands of PHEs in operation that are not working efficiently which could be unnecessarily


draining businesses. It is now time to make maintenance a priority for PHEs, not a reactive response to failure. “The current situation makes it critical that businesses manage the issues that remain in their control,” Rachel continues. “We hope this new report reinforces the importance of establishing a proactive and considered maintenance strategy and that PHEs are acknowledged as a significant part of a complex picture.”


[1] Fouling In Heat Exchangers: A Costly Problem | IMPO (impomag.com)


[2] Machine downtime costs UK manufacturers £180bn a year (theengineer.co.uk)


CARRIER HVAC SOLUTIONS


LIFECYCLE ASSET MANAGEMENT


Retrofit Upgrades Start-Up Rental Solutions Service Agreements


Spare Parts


Warranty


ABOUND™ HVAC Performance / Remote Connectivity


CONTACT CARRIER NOW: 01372 220220 | uk.info@carrier.com Read the latest at: www.bsee.co.uk Carrier hp BSEE Jun24.indd 1 8/5/24 14:40 BUILDING SERVICES & ENVIRONMENTAL ENGINEER JUNE 2024 15


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46