search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
BSEE


Unpredictable weather paerns have connued to hit the headlines in the UK in 2019. As weather volality increases, the risk of flooding across the UK is likely to rise. These changes are pung many buildings, as well as wider infrastructure, at risk. If changing weather paerns are to become the norm, what more can be done to migate the risk? Rob Butcher, design services manager at ACO Water Management, explains how there is work to be done in order to avoid the UK flooding crisis worsening


The rising problem of flooding


019 once again saw the weather dominate the news agenda as the UK experienced a number of extreme rainfall which resulted in flooding. As well as experiencing record temperatures, the country also saw heavy downpours this summer; while September saw the Met Office issue 27 flood alerts across England. What is striking is that, over the last few years, this pattern has become more and more regular. Some forecasters are predicting that weather volatility could become a long-term occurrence. With this in mind, it is becoming clear that all parties involved in water management system design, from contract engineers and specifiers to local authorities and facilities managers, need to factor in increased contingency for climate change. The reality is that more stringent maintenance processes will be required if the UK is to avoid these issues rising in the future. To achieve this, it is very likely that greater funding will be required. Let’s take a closer look at the impact maintenance has on drainage performance.


2


The importance of drainage maintenance


One area that is likely to exacerbate the effects of flooding is the maintenance of drainage solutions; or more accurately, the lack of it. The responsibilities tend to lie with either local councils or facilities managers, and in many cases, the responsibility for undertaking the physical task is outsourced to a third-party private contractor.


It is essential that regular inspection routines are carried out on drainage systems. While it may seem obvious, it is quite surprising to see how often drainage maintenance is neglected in the UK. By carrying out inspections at frequent and regular intervals, depending on the location and environment, flood risks can be identified and problems can be rectified early.


Inspections mainly lead to the removal of debris which accumulates over a period of time. By ensuring maintenance is not neglected, it not only helps to keep the original hydraulic capacity of the system, but it also ensures safety for pedestrians and vehicular traffic. Through the prevention of flooding.


While inspections should be a regular occurrence regardless of weather, something which is often overlooked is the need for additional cleaning of channels following heavy storms, as the risk of excess silt building up increases. This is especially problematic if the rainfall has followed periods of dry weather.


Building maintenance into the design


It goes without saying that some of the flooding issues in the UK are unavoidable and inevitable. In August 2019, for example, Whaley Bridge was evacuated due the high risk of its dam collapsing. However, if the UK experiences extreme weather episodes, such as two weeks’ worth of rain in a 24- hour period, regular maintenance of drainage channels could mitigate long term damage from extensive flooding. Identifying the potential problems early is key and building engineers and project managers have an important role to play in ensuring they are collaborating with all stakeholders. This includes engagement with water management specialists at the earliest opportunity. By working with drainage experts, it ensures that appropriate levels of access points will be factored in at the design stage. Failing to incorporate sufficient access points, and not undertaking maintenance, will inevitably lead to flooding problems. Many water management systems have been in place for a number of years and these have not necessarily been designed with a contingency plan to deal with the more frequent weather changes the UK has experienced in recent years. Surface water drainage systems are often designed to cope with a 1:30-year storm, which is problematic as the combination of a low hydraulic capacity design and poor maintenance is likely to heighten the flood risk.


Smart drainage design


While we can’t control the weather patterns that the country is experiencing, engineers do have an important role to play in ensuring that flood risks are mitigated. Those working on the design of buildings and infrastructure which require drainage systems and roads should look towards utilising design platforms which identify accurate rainfall data of the geographical area they are working on, and manage drainage appropriately.


ACO Water Management has developed an online hydraulic design software which allows designers and engineers to plan ahead with all the knowledge they require for a building project. Taking advantage of ACO’s free QuAD tool can help engineers understand the environmental challenges they may face ahead of the build phase of a project. This is achieved through the software’s ability to integrate with Google Maps, meaning users can input their site’s exact location and automatically receive the rainfall intensity for the area. Users can also test their proposed maintenance schedule using the in-built resilience feature. The importance of both adequately and regularly maintaining drainage channels cannot be stressed enough, especially if further heatwaves and subsequent downpours become the norm in the UK.


uThe importance of both adequately and regularly maintaining drainage channels cannot be stressed enough, especially if further heatwaves and subsequent downpours become the norm in the UK


18 BUILDING SERVICES & ENVIRONMENTAL ENGINEER DECEMBER 2019


When working on a project and considering how to mitigate a potential flood risk, it is advised that you get in touch with a water management specialist. For further support, utilising tools like QuAD can assist in the design for your specific project, factoring in the changing climate and up-to-date calculations.


For more information on ACO Water Management, and its QuAD cloud software, visit:


www.aco.co.uk/quad-roadshow Read the latest at: www.bsee.co.uk


uSurface water drainage systems are oen designed to cope with a 1:30year storm, which is problemac as the combinaon of a low hydraulic capacity design and poor maintenance is likely to heighten the flood risk


MAINTENANCE & REFURBISHMENT


Why drainage maintenance should be a top priority for 2020


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50