Data acquisition
ADAQ7769-1 The ADAQ7769-1 builds upon the ADAQ7767- 1 by adding a single-ended programmable gain low noise amplifier. It is still capable of the ±24 V single-ended input range, allowing a DC- coupled IEPE sensor architecture with a more complete solution.
Figure 6. Case isolated accelerometer and an isolation base.
GENERICS AND DISTINCTION There are other generics from the ADAQ7768-1 that use the same integrated ADC, namely the ADAQ7767-1 and the ADAQ7769-1 (Figure 11).
ADAQ7768-1 The ADAQ7768-1 includes a fully differential PGIA. With its high impedance and low input bias current, it connects directly to various sensors. Unlike a conventional voltage feedback amplifier, the integrated PGIA maintains nearly the same bandwidth across all its gain settings— leading to tight device-to-device phase matching regardless of the gain setting.
ADAQ7767-1 The ADAQ7767-1 does not provide an integrated input amplifier—lowering cost and enabling the customer to provide custom input signal conditioning. This device has three input ranges, with a maximum of ±24 V for single-ended inputs, allowing a DC-coupled IEPE sensor architecture and a simpler power solution.
IMPLEMENTING SYNCHRONISATION To obtain the full phase matching performance of these products, it is required that the device follows proper methods of synchronisation.
While there is a generic method of synchronising various products, some devices have their own unique methods that are usually added as a benefit to the overall system. Generally, in many SD ADCs, a SYNC or ¯("SYNC_IN" ) pin is provided to allow a controller to synchronise separate, and usually similar, ADCs with each other. In time-sensitive ADCs, this typically comes with the requirement to have the SYNC pulse in sync with the sha red controller clock (MCLK). Otherwise, the synchronisation trigger of one device may be
Figure 7. Proper grounding: Isolated at the instrumentation, grounded at the accelerometer.
Figure 8. The ADAQ7768-1 functional block diagram. Instrumentation Monthly September 2024
Continued on page 24... 23
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100