search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Predictive maintenance & condition monitoring


A GLIMPSE INTO THE FUTURE OF WIND TURBINE MAINTENANCE


W


ind turbines are playing a crucial role in the expansion of greener energy alternatives currently contributing around 30 per cent of the UK’s total electricity


generation. Like any rotating industrial applications and machinery, timely and efficient maintenance is critical for wind turbines. For example; understand the dynamic behaviour, establish a baseline performance to detect the early onset of failure of rotating parts. As with all condition monitoring, if machinery is left unchecked there will always be increased potential for more serious damage and disruption.


LOOKING TO THE FUTURE OF WIND TURBINE MAINTENANCE


Condition monitoring specialist Sensonics are continually developing advancements in wind turbine blade health monitoring and their collaborations, along with the major players in wind turbine projects, are a good example of how they contribute to ensuring the giants of green energy continue to spin cleanly and efficiently now and in the future. The latest example of this is their recent visit to the Crystal Rig ll Wind Farm near Dunbar in East Lothian, as part of a collaborative team from Natural Power and the University of Huddersfield. The wind farm has an installed capacity of 138 MW and is managed by Natural Power, part of the Fred Olsen Group.


AIMS AND OBJECTIVES


This UK government funded project investigating blade health monitoring at the Crystal Rig wind farm holds immense promise for the wind energy industry. By leveraging the latest sensor technology, university expertise and real-world data collection, the project has the potential to revolutionise how we maintain wind turbines. By visiting the wind farm the project team were able to see the 2.3 MW Siemens turbines in action and discuss the monitoring strategy with the site personnel.


WHAT SENSONICS EQUIPMENT HAS BEEN INSTALLED?


T57 at the Crystal Rig ll site has been fitted with a range of sensing and data equipment from Sensonics to develop a database of measured performance data across a range of blade conditions.


The main objective of the project is to provide operators with ‘live’ blade data health through the monitoring of the main bearing only, then processing the data through specialised algorithms developed by the University of Huddersfield, combined with machine learning techniques.


58


Here is what this project could mean for the future


Early detection of blade issues: Catching blade deterioration early translates to reduced repair costs and improved turbine uptime which ultimately results in significant financial benefits for wind farm operators.


Improved operational efficiency: Real- time blade health data allows for optimised maintenance schedules, minimising downtime and maximising energy production.


Extended turbine life: Proactive blade maintenance can extend the lifespan of wind turbines, delaying expensive replacements and maximising return on investment.


Non-intrusive monitoring: The focus on non-rotating parts for sensor placements simplifies installation and reduces maintenance complexity.


FUTURE BENEFITS


The Crystal Rig ll project exemplifies the power of collaboration between industry leaders like Natural Power, academic institutions like the University of Huddersfield and sensor specialists like Sensonics. By combining this expertise and the valuable resources, this project is paving the way for ground breaking advancements in wind turbine health monitoring, representing a significant step forwards towards a future where wind turbine maintenance is more predictive and efficient.


Sensonics www.sensonics.co.uk


 


 


 





 


October 2024 Instrumentation Monthly


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96