University Study Reports Significant Savings From VSRT Installation
The University of East Anglia (UEA) is no stranger to steam boilers from Fulton having been using the heat transfer specialist’s solutions for many years. But having replaced their ageing plant with new VSRT boilers, even they were surprised at just how efficient the installation would prove!
With steam being essential to the University and used extensively for humidification purposes – to ensure that the appropriate environmental conditions of 55% to 65% RH are maintained – and for the autoclaving of equipment and waste, any installation needed a form of redundancy in place from the outset.
Installed in 2004 and handed over to the facilities team in 2005, the University’s original installation therefore featured three J Series boilers, allowing for two to cope with daily requirement and the third as a standby for when steam demand was high or during servicing and maintenance schedules on the other boilers.
Commenting for UEA, Estates Project Lead Philip Page says: “Even during the original planning phases for the boiler plant room we knew that floorspace, headroom and access was going to be limited. With horizontal firetubes out of the question and many vertical boilers at the time requiring almost double the height of the boiler itself for maintenance purposes, Fulton’s J Series was the perfect solution.
“Fast forward to when we started the replacement programme for the J Series a review revealed that things, in the most part, hadn’t changed in the boiler market and no other boiler that could fit within the plant room was as capable or efficient. We therefore put the programme on hold.”
Thankfully for the University, when the time did come to complete the replacement programme, a market review in 2019 revealed that Fulton had just launched its all-new VSRT, the most radical change to vertical steam boiler design since the company pioneered the vertical tubeless boiler back in 1949; and the world’s first fully-wetted, refractory-free vertical tubeless boiler. The compact footprint of the VSRT also meant it was a perfect fit for the existing plant room.
24 fmuk Available with outputs from 160 to 960 kg/h, the VSRT1 boasts
ultra-low NOx emissions of less than 20ppm, achieved thanks to the VSRT’s combustion technology that features a modulating burner and furnace that have been purposely-designed as a single component and fully-matched with the VSRT in mind. This has helped Fulton to achieve up to 10:1 turndown capabilities and industry-leading
performance of >82.5% gross thermal efficiency and 99.75% steam quality at 8 bar.
Having been in constant use for over 14 years, the University replaced all three Fulton J Series steam boilers with an all-new heat transfer system featuring three VSRT-50 boilers complete with all necessary ancillary plant including water treatment, chemical dosing, blowdown vessel and feedwater tank.
Because of the plant room’s situation – located in the middle of the building on the second floor – a temporary steam main was installed and piped to an external boiler plant solution that was hired so the facility’s steam supply could be maintained. A crash desk was then built two floors up, the end wall of the building removed, and the J Series boilers removed and replaced with the VSRTs. In total, the entire replacement process took six weeks to complete.
Two years after the VSRT installation was commissioned and handed over to the University’s
estates team, a review of
energy savings was commissioned to compared the old and new installations, with the results proving significant.
“The sustainability team compared the last 12 months usage of the three VSRTs to that of the three J Series boilers’ pre-Covid usage in 2019 and has reported a reduction in gas consumption of nearly 28% and over 57% for water.” says Philip. “Even if you don’t to take into account the recent cost increases in gas, these savings are significant and really impressive!”.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44