Fire Safety


including the high ceiling zones. Following installation, the entire system was tested and calibrated to ensure optimal performance.


Another challenging factor in the project was the need to undertake phased works which operated in parallel with the warehouse construction. Several planning meetings took place to fully understand the site conditions and construction schedule. These meetings were crucial in ensuring that the installation would proceed smoothly alongside the building’s construction. Both the EDSB and Siemens teams, as well as the construction managers, worked together to align on the scope, timeline and logistics of the project. Additionally, potential challenges such as access points and space constraints were identified and strategies were put in place to prevent delays later in the project.


Geoff Wain is a Senior Project Manager at EDSB. He comments – “This project has been a coordinated effort from the design stage through to installation and commissioning, primarily utilising in-house engineers. A dedicated site project engineer handled daily communication with our client to ensure that the phased works were completed on time, delivering the project to the end client. The high standard of workmanship across the site is a testament to all those involved.”


Alistair Lyon was EDSB’s Install Leader on the project who said - “I believe what we have achieved is something that should be celebrated. This has been a long, challenging and complex installation and we have delivered an end product that we can all look back on and say we are proud to have been a part of.”


The facility has a Desigo CC building management head end which is able to display the information relating to the fire system and allows operators to visualise it. Desigo CC is also used on site to manage the HVAC systems, meaning all the building operation data can be viewed via a single interface. This leads to operational and energy efficiency savings. The on site computerised maintenance management system (CMMS) is also integrated into Desigo CC, with its open architecture allowing this integration to happen.


Siemens’ John Fennah added - “At Siemens we always strive to work closely with our partners and this application is an excellent example of how such an approach can achieve the best solution. By understanding and addressing the specific challenges presented by this warehouse, EDSB were able to match the appropriate technology with the different requirements, arriving at an integrated system which optimises fire safety while effectively managing the HVAC.”


In total, the site comprises nine networked Siemens fire panels, 34 Siemens aspirator panels, and more than 30 high- level Siemens beam detectors. The warehouse is equipped with 200 interfaces that control various shutdowns and integrate with third-party systems. Special care was taken to ensure the system provides comprehensive coverage.


For further information on fire safety solutions visit: www.siemens.co.uk/cerberus


For further information on Siemens Smart Infrastructure visit:


www.siemens.com/smart-infrastructure


fmuk 21


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44