HRSGs and boilers |


Valmet to provide biomass fuel handling and feed for coal-fired CFB in Indonesia...


PT. Cikarang Listrindo Tbk’s coal-fired circulating fluidised bed based Babelan power plant in Indonesia


Valmet is to supply a second biomass fuel handling and feed system for PT. Cikarang Listrindo Tbk’s coal-fired circulating fluidised bed (CFB) based power plant in Babelan, Indonesia, with installation scheduled for the first quarter of 2025.


The two Valmet-supplied CFB boilers at Babelan started operation in 2017. In 2021, Valmet delivered a biomass fuel handling and feed system for the unit 1 CFB boiler to support co-firing. “Thanks to positive experience gained with using palm kernel shells and then woodchips at the site, PT. Cikarang Listrindo decided to install a similar biomass system for the other CFB boiler unit of the Babelan power plant,” says Jouni Koskinen, senior manager, sales and technology, pulp and energy, Valmet.


“This new step will allow up to 25% of the company’s total coal consumption to be replaced by biofuel,” noted Sami Sivola, head of the environmental sustainability team, PT. Cikarang Listrindo.


Valmet’s scope includes, as well as the engineering, supply and construction of the new biomass fuel feeding system, the addition of a flue gas recirculation system for the unit 2 CFB boiler. The furnace bottom will also be modified to improve coarse material removal from the fluidised bed.


PT. Cikarang Listrindo Tbk, located in Bekasi Regency, Indonesia, is the longest established independent power producer in Indonesia, having started its initial operations in 1993. It currently serves more than 2600 industrial customers in five industrial estates in Cikarang and, in terms of installed capacity is one of largest electricity companies in Indonesia. CFB technology lends itself to the use of solid renewable fuels such as palm kernel shells and wood residues as substitutes for coal. As part of its carbon reduction roadmap, Cikarang Listrindo plans to gradually increase the use of biofuels up


20 | April 2024| www.modernpowersystems.com


to about 20% of the CFB boiler capacity at the Babelan coal fired plant. The addition of biomass fuel handling at unit 1 in 2021 became “a pilot project for the use of palm kernel shells first and then woodchips as an initial step in adopting biofuels as a renewable energy alternative to fossil fuels,” says Cikarang Listrindo, indicating that other biofuel options will also be considered as alternatives in the future.


The Babelan coal fired plant is equipped with electrostatic precipitators (ESP) for control of particulates, while control of sulphur dioxide emissions is achieved by selecting fuels with low sulphur content and adding limestone to the boiler to reduce the formation of SO2


and SO3 .


Emissions at Babelan are monitored in real- time using a continuous emissions monitoring system (CEMS) installed at each chimney of the plant. The CEMS is integrated with the national Continuous Industrial Emissions Monitoring Information System (SISPEK) and can be accessed by the Ministry of Environment and Forestry (KLHK) at any time. This demonstrates Cikarang Listrindo’s “commitment to transparency and professionalism in managing power plant emissions,” the IPP asserts, observing that emissions reports


are presented to the public through the company’s sustainability report and certified by international independent parties. The SO2


, and particulate emissions from the Babelan coal fired power plant in the first half of 2023 were reported as <163 mg/Nm3 , and <32 mg/ Nm3


, NOx , <181 mg/Nm3 , respectively, said to be “well


below the environmental limits set by KLHK.” Another positive feature the Babelan coal fired power plant emphasised by Cikarang Listrindo is its use of an air cooled condenser, minimising water consumption.


…and rebuild for Steven’s Croft


Valmet is to carry out a major boiler rebuild at E.ON’s 44 MW Steven’s Croft biomass combined heat and power station in Lockerbie, Scotland, with implementation during the second quarter of 2024.


The Steven’s Croft Valmet-supplied bubbling fluidised bed (BFB) boiler started up in 2008. With good day-to-day maintenance and regular


refurbishments, the boiler’s performance has been kept at an “outstanding level”, says Valmet. However, the boiler’s primary superheater, economisers, primary air preheater and screen tubes will now be renewed, “securing its reliable operation for the future.” Special corrosion resistant material will be used where applicable to prolong life, the company notes.


Valmet CFB boiler of the type installed in the Babelan power plant


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43