CASE STUDIES
Fig 4: Connection of the liner with connector for crossing the lock
Fig 5: At this position, the liner is pressurised with water and lowered to the canal floor
These include significant advantages in terms of mobilisation and equipment requirements. The fabric-reinforced liner is transported on reels, saving space. Installation requires a mini-excavator or winch and simple hand tools. There is no need for machinery, manpower or time spent on complex welding to make the connection. Installation and dismantling times are correspondingly shorter. Primus Line normally take one or two days to lay six kilometres of their liner. Lengths of 1,000 metres and more in one section reduce the number of joints and weak points. The liner easily adapts to the unevenness of the surface. By comparison, installing the same length of HDPE pipe takes about 25 to 30 days, with increased additional labour costs. Dismantling the same length of pipe also takes only one to two days with Primus Line® Overland Piping, as the liner is simply rolled up, compared with seven to ten days for HDPE. The subsequent storage requirements for HDPE pipes are up to ten times greater than for liners on reels. In addition to storage and transport costs, operating costs are on average also lower due to minimal mobilisation and demobilisation costs and lower manpower requirements.
In addition to cost and efficiency, the low use of machinery also contributes to the environmental friendliness of the Overland Piping system. It can be installed in sensitive environments such as protected areas, nature parks or rivers without major environmental impact. This avoids emissions and reduces the carbon footprint.
The middle layer of the three-layered Primus Line® Overland Piping system ensures the safety of the flexible pipe: It is made of seamlessly woven Kevlar®. This synthetic fibre is up to ten times stronger than steel and twice as strong as glass fibre or nylon. The flexible pipe therefore has a very high factor of safety (FoS). The burst pressure is at least 2.5 times higher than the allowable operating pressure. The entire production process is closely monitored. Sensors and cameras continuously capture the process parameters and provide the basis for extensive wall thickness and consistency
28 | August 2024 |
www.draintraderltd.com
control mechanisms. In addition, every liner produced is subjected to an in-house pressure test before being delivered to the construction site.
Fast installation in emergency cases
Primus Line® Overland Piping also provides a solution in the event of catastrophes such as landslides, floods or forest fires that cause pipeline damage or failure. A single container can hold two to four kilometres of flexible pipe with the appropriate fittings. In case of an emergency, the flexible and spoolable Primus Line® above-ground pipe can be installed immediately and – depending on the environmental conditions – within a short period of time. In addition, the Primus Line® Overland Piping system has a very long service life – depending on the type of use and the conditions.
About Rädlinger primus line GmbH
The idea for an innovative product was born over 25 years ago. Today, Primus Line® is used worldwide as a safe, reliable and sustainable solution. It is used in the trenchless rehabilitation of pressurised pipelines (Primus Line® Rehab) and in the construction of freely layable pipelines (Primus Line® Overland Piping).
The core of the Primus Line® technology is a flexible pipe consisting of a fabric-reinforced liner and specially developed connectors. Suitable for the transport of water, oil and gas, it has the necessary approvals from many countries around the world and meets the highest standards for use in the drinking water sector.
Founded in 2001, Rädlinger primus line GmbH currently has around 100 employees at its headquarters and production site in Germany and branches in the USA, Canada, China and Australia, as well as a large, international and specially trained partner network.
primusline.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76