98
INSULATION
Inverting perceptions on roofi ng design decisions
Rob Firman at Polyfoam XPS looks at new recommendations for inverted roof buildups under the revised British Standard, and refl ects on how specifi ers’ decisions on roofi ng systems have ramifi cations through a building’s life.
Having the knowledge that installation techniques for WFRLs have become more robust improves certainty
T
he revised code of practice BS 6229:2025 (Flat roofs with continuously supported fl exible waterproof coverings) seeks to reduce the gap between how fl at roofs are designed in theory, and how they perform in reality. This is to be welcomed, especially as we continue to see inverted roof specifi cations increase from year to year.
Before we get into detail about what the 2025 edition of BS 6229 says about inverted roofs, it is worth revisiting what happened when the 2018 version of BS 6229 introduced a controversial and confusing guidance note for inverted roofs. An inverted roof is so called because the waterproofi ng layer sits below the thermal insulation layer and ballast fi nish. Some water is expected to penetrate the ballast and insulation layers and drain from the waterproofi ng layer. To reduce the amount of water reaching the insulation layer, a water fl ow reducing layer (WFRL) can be added above the
WWW.ARCHITECTSDATAFILE.CO.UK
insulation and below the ballast. It is not a waterproof layer, but inverted roof test results and corrections to inverted roof U-value calculations show WFRLs to be important and an effective addition. BS 6229:2018 posited that more water reaches the waterproofi ng layer than is predicted in theory. It featured a note saying that the thermal insulation layer could be increased in thickness by 10% to help address additional heat loss. The note was not a formal recommendation, and agreement on whether it should be applied or not was never reached within the fl at roofi ng sector. For the publication of BS 6229:2025, the note has been removed – bringing any debate about its application to an end once and for all. To try and reduce potential inverted roof performance gaps, BS 6229:2025 has dispensed with additional corrections to calculated insulation thicknesses. Instead, its focus is on practical considerations that should ensure WFRLs deliver their tested performance.
One new recommendation in particular seeks to address scenarios where a WFRL might move during the roof construction. Above the waterproofi ng layer, inverted roof systems are loose laid. They rely on the weight of the ballast layer to keep the thermal insulation and WFRL in place. However, installing the system on an advancing front, there is concern that the relatively lightweight WFRL membrane could move during installation. Manufacturers and suppliers of inverted roof kits (the name that describes the combination of thermal insulation and WFRL) require the WFRL to be laid with a 300 mm lap at the joints between separate runs of membrane.
ADF APRIL/MAY 2026
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116