86
EXTERNAL ENVELOPE
Hörmann SPU F42 door delivers reliability and performance for RNLI Lifeboat Station
H
örmann UK industrial trade partner,
Lincolnshire. Designed Norwich-based Cooks
Doors, has successfully completed the installation of a Hörmann SPU F42 sectional door at the RNLI Lifeboat Station in Mablethorpe,
to perform in some of the UK’s most demanding environments, the new door provides the RNLI with a robust, reliable, and highly effi cient solution to support its vital operations. Measuring an impressive 7,500 x 3,650 mm, the SPU F42 sectional door was specifi ed for its strength, durability, and consistent performance in what is a challenging coastal setting. Manufactured from galvanised steel with a solid, double- skinned construction and a high-grade polyurethane foam core, the door offers excellent thermal effi ciency,
helping to
maintain a stable internal environment within the lifeboat station. With a thermal insulation value of 1.2 W/m2K, the door helps reduce heat loss, supporting energy effi ciency and
The door is fi nished externally in Gentian blue (RAL 5010), complementing the lifeboat station’s
appearance, while the off-white
interior fi nish (RAL 9002) helps to brighten the internal space. Two rows of vision panels were incorporated into the design, allowing increased natural light into the building and improving visibility without compromising strength or security. Operational
reliability
creating a more comfortable working space for the RNLI crew. Given
the exposed coastal location,
resistance to the elements was a key consideration. The SPU F42 achieves Class 3 performance for both wind load and water tightness, helping to protect the station interior, equipment, and lifeboats from harsh weather conditions.
Additional corrosion
protection has been applied to the door fi ttings to further enhance longevity, ensuring reliable operation despite constant exposure to salty sea air.
A fresh look from Garador: Launch of its new website
G
arador has launched its new website,
delivering an improved digital experience for customers
and partners.
The redesigned site introduces a more modern look and feel, alongside enhanced navigation to help users access key information quickly and easily. With a strong focus on usability, the updated platform ensures visitors can fi nd what they’re looking for with minimal effort, whether browsing
on desktop or mobile.
The new website features a clearer structure and improved layout, allowing users to move seamlessly between different sections. Visitors can now explore company information, stay up to date with the latest news, and access contact details through a more intuitive and streamlined journey. In addition to improved navigation, the refreshed design provides a more consistent experience across all pages, helping users engage with content more effectively. The site has been developed to support both existing customers and new visitors, offering a straightforward way to learn more about Garador and its offering. Sam
Todd, commercial manager at
Garador, said: “The new website represents an important step forward in how we present information online. It provides a much- improved experience and makes it easier for customers to fi nd what they need.” The launch refl ects Garador’s ongoing
day-to-day is critical In for
the RNLI, where rapid response times are essential. The SPU F42 is powered by a 400v three-phase operator, dependable
the
providing smooth, operation.
event of a power failure, a manual hand chain ensures the door can be operated, maintaining access at all times. Safety has also been prioritised, with an integrated safety edge that automatically stops the door if an obstruction is detected, helping to protect personnel, vehicles, and equipment.
01530 516868
www.hormann.co.uk
commitment to improving customer experience and strengthening its digital presence. As the business continues to evolve, the website will play a key role in supporting communication,
accessibility,
and engagement with customers and partners alike. Visit Garador’s new website or for information about all the Garador doors, just call.
01935 443 700
www.garador.co.uk
WWW.ARCHITECTSDATAFILE.CO.UK
ADF APRIL/MAY 2026
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116