search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
102 HEATING, VENTILATION & SERVICES Design, decarbonise, deliver


Richard Brown at Ideal Commercial Heating explores key pointers for specifi ers looking to transition projects from gas boilers to heat pumps.


and air tightness can reduce peak heating loads by as much as 60 to 70%. This has a direct impact on the size of heat pump plant required, the capital cost of the system, and the achievable seasonal effi ciency. This fabric-fi rst mindset is refl ected in industry guidance such as CIBSE AM17.


Understanding the client brief & project objectives


Commercial heat pump projects succeed when technical solutions are aligned with the client’s objectives, whether the primary driver is carbon reduction, regulatory compliance, operating cost control, resilience, reputational performance or a combination of these. Budget constraints, expectations around comfort, requirements for redundancy and resilience, and plans for future building use all infl uence the most appropriate system approach. The way in which the system will be operated and maintained, and how it will be handed over to facilities teams, is equally important.


T


Commercial heat pump projects succeed when technical solutions are aligned with the client’s objectives


WWW.ARCHITECTSDATAFILE.CO.UK


he electrifi cation of heat is now fi rmly embedded in the future of the UK’s built environment. Yet successful deployment relies on far more than replacing one appliance (a boiler) with another (a heat pump). It demands careful design, an understanding of buildings in their entirety, and a rigorous approach to specifi cation. The most successful projects are those where heat pumps are treated as part of a whole-building strategy rather than as a single equipment substitution.


Start with the building


Before plant selection is even considered, attention should be given to how heat demand can be reduced at source. Improvements to fabric, insulation levels


These considerations often lead to more nuanced solutions than a straightforward move to fully electric heating. In many cases, hybrid systems that combine heat pumps with boilers provide a pragmatic balance between decarbonisation, cost control and operational confi dence. Hybrid systems can reduce upfront capital investment, maintain resilience during peak demand, allow gradual upgrades to distribution systems, and provide reassurance to facilities teams adapting to unfamiliar technologies.


Working within regulatory & best practice frameworks Designers and specifi ers are supported by a wide range of established guidance that helps shape better outcomes, such as CIBSE AM17 for large non-domestic heat pump installations, as well as CIBSE CP1 guidance for heat networks, Building Regulations Part L, and frameworks including EPCs, SAP, and MEES.


ADF APRIL/MAY 2026


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116