search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
STRUCTURAL ELEMENTS; EXTERNAL ENVELOPE 77


ICF from BEWI features in new build property with outstanding thermal performance


Thermomur® W


hen engineer Andrew Brash and his wife were looking to build a


forever retirement home in


the Suffolk village that they love, Andrew was immediately attracted to the elegance of an Insulating Concrete Formwork (ICF) solution.


It was the thermal performance and simplicity that particularly appealed. He also liked the durability of ICF: “If we were going to build a house with our name on it, we wanted something that was going to be around for a long time,” he says. ‘Mouses’ is a build


of 330 m2 on a


0.6-acre plot, which was completed in just 14 months, despite the large size of the building,


refl ecting the ease with which projects can be carried out using ICF. The product selected was BEWI’s Thermomur®


350 Super, which is designed to


provide an outstanding thermal performance (with a U-value of 0.15 W/m²K), and has full NHBC and BBA approval, while also


enabling a fast and effi cient build. The cost/ performance equation was viewed as a key benefi t, which could provide the thermal performance necessary to gain a Passivehouse rating. The house also easily achieved its airtightness target. From a practical point of view, the ability to screw into the sides of the blocks and the way they all fi t together also makes for a more straightforward build


than with other systems, while generating less waste. “We fi nd the performance


of the


completed house to be absolutely fantastic,” says Andrew. “When combined with triple glazing, mechanical ventilation with heat recovery, solar panels and a heat pump, we estimate that our total electric costs each year for everything on this large house will be less than £200.” The fl exibility of the system meant that


the team were able to deal with challenges as they arose on the job. Two recommendations which Andrew has, having completed his project, are to design any ICF self-build around the block dimensions as far as possible, to minimise cutting, and also to take maximum advantage of the training which is provided by BEWI for contractors without ICF experience who use the company’s Thermomur®


system. 0870 600 3666 www.bewi.com/uk


ADF APRIL/MAY 2026


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116