SPONSORED BY HEALTH SECTOR NEWS
Upgrade on ‘live’ nurse call system finished early
Static Systems Group has completed a ‘live’ site-wide upgrade to the nurse call system at Queen’s Hospital in Burton for the University Hospitals of Derby and Burton NHS Foundation Trust in just over three years, rather than the anticipated 4-5 years.
The 450-bedded hospital had over 40 existing nurse call systems, including conventionally wired Static Systems equipment, some of it in place for some 25 years, and much of it becoming obsolete, with maintenance costs rising. Static Systems was appointed to replace every nurse call system, in a live,
fully occupied hospital environment, with its Codemlon loop wired addressable nurse call system selected for the job. Using Codemlon meant the containment and back boxes in most of the existing nurse call systems could be re-used. As Codemlon offers radio sound entertainment, the Trust could also continue providing patients with free-to-access radio, controlled through the patient handsets. A wireless nurse call system was deployed during the wired system’s upgrade to provide continuity, and enable Static Systems’ engineers to work in a live ward, a bay at a time. The hospital’s
Advanced alarm handling software
False fire alarms are a daily occurrence for most hospitals, and, if unmanaged, can detrimentally impact patient flow and welfare, while with Fire Service fines for repeat offenders starting from £290 per call-out, ‘the wider financial implications can be huge’.
So says Global View Systems, which recommends healthcare estates teams ‘minimise the impact of any incident with advanced alarm handling software – developed to keep them in full control, ensuring a swift incident response, while maintaining continued patient care’. The company said: “Our Advanced Alarm Handler connects all your critical alarms to your radio system. Full alert detail is sent in real time direct to your two-way radios, which allows trained personnel to determine the cause,
identify false alerts, and contain the problem before needless disturbance or a full evacuation. In an increasingly mobile world – where there is a need for security personnel to work at speed over greater distances – the Alarm Handler enables first responders freedom of mobility to carry out their responsibilities with the reassurance that any incident response will be immediate, and directly to the source.”
Extension to mobile theatre unit’s use
Following the success of an initial contract, a medical technology specialist is set to continue to help an NHS hospital Trust deliver orthopaedic procedures during a refurbishment project. Vanguard Healthcare Solutions began working with the Dudley Group NHS Foundation Trust in March, and was initially due to have one of its mobile laminar theatres on site at Russells Hall Hospital in Dudley for six months while the Trust refurbished its current orthopaedic theatre facilities. The current contract ended last month, but, such has been the project’s success, that the unit will return in November, and stay on site until May 2020.
Designed and built by Vanguard, the mobile theatre provides an anaesthetic
various ward-based systems were connected together using the Trust’s own LAN, enabling the Trust to transfer calls between adjacent wards/departments. To ‘futureproof’ the system, the Trust requested provision be made for incorporating ‘Fusion Analytics’ software in future – which it will use to collate and analyse data to demonstrate efficiency and levels of patient care.
Bespoke reception desk up for grabs for a charity
STJ Projects, which has an established team of dedicated and knowledgeable professionals working in many sectors, including healthcare and mental health, undertakes bespoke joinery manufacture and installation, as well as assuming the role of principal contractor on refurbishment projects.
Also a BM Trada Q-Mark-accredited fire door manufacturer, installer, and maintainer, the company will be exhibiting at tHealthcare Estates 2019, with its stand set to include a bespoke- designed and manufactured reception desk, which will be donated to a lucky charity or company, randomly selected by IHEEM President, Ian Hinitt, on day 2 of the exhibition.
room, operating theatre, two bed first- stage recovery area, staff changing room, and utility areas. A specially-constructed corridor and ramps join the main body of the hospital to the unit and ensure a seamless patient journey. Vanguard laminar flow theatre facilities offer HEPA- filtered environmental air that conforms to Grade A EUGMP, with up to 600 air changes per hour passing over the patient, and 25 fresh air changes.
Please contact Lee Cranidge of STJ Projects via email at
lee@stj.uk.com, or provide your email address via the STJ Projects LinkedIn page, to enable the company to forward you a Proposed Recipient form to complete to nominate a charity or company. Completed forms will then be presented for random selection, with the results published on LinkedIn following the exhibition, and within the STJ Projects newsletter.
October 2019 Health Estate Journal 17
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160