search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
INTEGRATED CARE PROVISION


Grove View was delivered with support from the Bedfordshire Hospitals NHS Foundation Trust, Bedfordshire, Luton and Milton Keynes ICP, and Central Bedfordshire Council.


Patient-centric features such as comfortable waiting areas, soothing colours, and natural lighting, promote a sense of calm and wellbeing. The spacious layout ensures privacy and ease of movement for patients, while accessibility is prioritised through the integration of lifts, and user-friendly wayfinding. The wellbeing principles of the end- users were factored into the design of the health hub, and the key features of this included: n Natural light to all occupied rooms, short journey times to lifts and stairs from all


Willmott Dixon says Grove View’s ‘flexible design and construction solution’ provides end-users with the option for future expansion, with, for instance, multi-use rooms.


areas of the building, and all rooms are of a regular shape and size for ergonomic and multiple service delivery.


n Out-of-hours activities concentrated on the ground floor to maximise security and avoid lone working on upper levels.


n Provision for vista and outlook onto green spaces to enhance the therapeutic environment characteristics for the users.


Innovative solutions: The standardised Cura model Grove View’s adoption of Willmott Dixon’s innovative standardised Cura model


stands at the forefront of healthcare transformation. The model emphasises the integration of care services, enabling a personalised and holistic approach to patient care. The configuration of the hub provides a standardised grid optimised for the clinical room sizes, and standardised components which improved quality and the speed of delivery. Its flexible design and construction solution provides end- users with the option for future expansion, with multi-use rooms and design principles that allow spaces to be repurposed as service needs change.


EN50171 compliant central power supply systems (CPSS) from Power Control


120% overload capacity Batteries with 10 year design life


Battery polarity reversal protection


80% autonomy restored within 2 hours IP20 rated metal enclosure


Automatic testing of emergency circuits


Uninterrupted Care


In an sector where power is critical for patient safety, it is important not to overlook the need for backup power to other life safety systems.


Evacuation and firefighters lifts


Smoke detectors and fire alarms


Fire suppression systems


Emergency lighting


We're Exhibiting Stand C25


powercontrol.co.uk 01246 431431


info@powercontrol.co.uk


October 2023 Health Estate Journal 113


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124