search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
REFURBISHMENT PROJECTS


2 Theatre 2. 3 Theatre 3. 4 Theatre 4. 5 Theatre 5. 6 Theatre 6.


Figure 1: Top: the layout of the ‘old’ Surgical Block. Bottom: the interior layout post-refurbishment.


different floors;


n fitting of new fire-resistant doors on the escape routes, with removal of existing glazed doors;


n the expansion of the automatic fixed fire detection and alarm systems;


n the expansion of the alarm and sound diffusion system;


n the design of a new medical gas system; n new electrical systems, with new LED lighting;


n installation of new air-conditioning systems – including AHUs, distribution ducts, and terminal units, and


n the fitting of new windows compliant with fire and safety regulation. The project also involved the


refurbishment of two operating theatres, and a new design for the the Lounge Room to enhance the hospital’s Haemodynamic Service – previously delivered in single room – and to improve the patient journey, from the waiting area, through to preparation, therapy, and discharge.


A quiet area to relax in The new Lounge Room layout was designed to offer the patients a quiet area to relax in before and after medical treatment, with space for rest, reading, and internet access, etc. This facility is strategically located, to allow direct access to the two new operating theatres for haemodynamic treatments once patients have entered the Surgical Block. The design strategy addressed the


physical elements (e.g. different ceiling heights in the operating theatres 1, 2, 3, and 4, and theatres 5, 6, 7, and 8, levelled out via the installation of a false ceiling at


70 Health Estate Journal October 2022


a 3-metre height), the existing layout, and the operating procedures expected to be carried out. It also took into account the need to implement the Haemodynamic Service, and to create a quiet, private, and relaxing area for patients. The final layout delivered a complete, fully equipped new Surgical Block, with six operating theatres, plus ancillary support spaces, and a new fully equipped Haemodynamic Service area, with two dedicated haemodynamic theatres, and associated ancillary facilities. The Surgical Block incorporates the


rooms listed below, and shown in the floorplan in Figure 1. 1 Operating theatre 1,


7 Haemodynamic room 1. 8 Haemodynamic room 2. 9 Sluice room. 10 Washing & sterilisation room. 11 Clean utility. 12 Dirty utility 13 Storage. 14 Scrub room. 15 Induction room. 16 Neonatal area. 17 Medical equipment room. 18 Control room. 19 Disposable material storage room. 20 ‘Recovery’ cubicles. 21 Orthopaedics sterile supply material. 22 Orthopaedics equipment. 23 Orthopaedics ‘prep’ room. 24 Physicians’ relaxation room. 25 Physicians’ room. 26 Monitoring & control room. 27 Staff relaxation room. 28 Sterile utility room. 29 Female staff changing room – filter area.


30 Male staff changing room – filter area. 31 Stretcher change area – filter area. 32 Head nurse’s room. 33 Staff changing room. 34 Physicians’ room, and 35 Physician on call. The Lounge Room houses the rooms listed below, and shown on the floorplan. A Front and control desk. B Anamnesis room. C Male patient changing room. D Female patient changing room. E Patients’ cubicles. F Reading area, and G Internet area. Project design and construction management were undertaken by Nikolaos


One of the haemodynamic theatres within the refurbished building.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124