search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
INFECTION PREVENTION AND CONTROL


Infectious Agent


Susceptible Host


Melanie Jacobsen Cox


Melanie Jacobsen Cox joined HLM as head of Healthcare in early 2022, bringing extensive experience in the technical project delivery of healthcare architecture. She is ‘inspired by refining processes and efficiency, while building a network of best practice to enable healthcare providers to deliver improved care for patients through the thoughtful design of therapeutic and healing environments’. She is responsible for expanding and advocating ‘the extensive expertise’ of the HLM healthcare leadership team, strategically growing existing business relationships, and creating new opportunities nationally across all areas of the healthcare industry.


Everything is connected, and IPC risk assessment and resolution need to look beyond the obvious.


Portal of Entry


Mode of Transmission


n Non-clinical space considerations – support facilities – waste, cleaning, linen, storage.


n Clean to dirty patient flow: why is it important?


Session 3: Water safety in healthcare environments – Key risks and considerations n Waterborne pathogens and transmission, and at-risk patient cohorts.


n Introduction to biofilms / microbial risks within a complex water system.


n Project water safety plan and design roles within the Water Safety Group.


n Project governance and accountability.


Session 4: Preventing an incident / outbreak n Learning scenarios – risk assessment and mitigation.


Session 5: Ventilation in healthcare settings n Airborne pathogens, transmission, and at-risk patient cohorts.


n High-risk patient groups / settings. n Plant spaces: What are the IPC considerations? – design considerations from IPC perspectives.


n Specific considerations for planned construction/ renovation activity.


The hierarchy of controls against IPC risks needs to start with a focus on elimination.


effective Most


Session 6: HAI-SCRIBE (Healthcare Associated Infection – Systems for Controlling Risk in the Built Environment) n Risk assessments and IPC.


Hierachy of Controls Elimination


Substitution


Engineering controls


Administrative controls


PPE effective 62 Health Estate Journal November 2024 Least


All the sessions were recorded, so that participants could go back and re-watch deeply thought-provoking presentations and follow on discussions. Some of the issues and questions that the sessions raised included: n ‘We’re encouraged to reduce Net to Gross internal area percentages as much as possible – including reducing circulation spaces – compromising the separation of clean and dirty flows.’


n ‘Should we be raising infection prevention and control risks, and ventilation and water safety, as residual risks that require ongoing management by the end-user to minimise and mitigate prevalent and known risks?’


n ‘When we start a new project at an existing hospital – as designers, should we be asking to see the Trust’s / Health Board’s Water Safety Plan and Ventilation Safety Group notes?’


Following on, the sessions kickstarted internal revisions


to the way in which we work. Among the key outcomes were: n Colleagues reported an increased awareness around healthcare-associated infections, especially around the relative revelation that clinical basins were not necessarily a source of cleanliness, more a point of disposal, and could potentially introduce contamination to a space.


n A better understanding around external influences such as adjacencies to factories or industrial processes, which could have a detrimental effect on air quality supplied to a space, especially if there is not sufficient remediation in the air-handling unit, such as filters.


Physically remove the hazard


Replace the hazard


Isolate people from the hazard


Change the way people work


Protect the worker with Personal Protective Equipment


n Greater understanding of waterborne and airborne pathogens, along with the external, construction, and maintenance implications, and the need to consider IPC at the earliest stage.


n Greater insight into the complexities and importance of the commissioning and witnessing process, and how construction management can undermine satisfactory installations. This included discussions around MMC (Modern Methods of Construction), and prefabricated elements such as IPS panels and en suite bathroom pods, which can be constructed outside the controlled environment, and were then installed and commissioned as part of the overall system


n Wider understanding of our role within IPC design, and the need to provide robust specifications, but also better considerations around future maintenance – making this easy, and inclusion of future maintenance


Reservoir


Chain of Infection


Portal of Exit


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72