search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
DOCTOR’S ORDERS


F. Ball prescribes products for a doctors’ laboratory in Salford. Contractors used


F. Ball’s dual-purpose Stopgap Fill and Prime and Stopgap


700 Superflex flexible levelling compound to prepare 1,500m² of metal raised access panels.


Products from F. Ball and Co. Ltd. have been used to create a hygienic flooring finish as part of a refurbishment at The Doctors Laboratory, in Salford, Manchester, which provides highly specialised pathology/clinical laboratory services to clinicians (GPs and specialists), hospitals, community health services and their patients.


Paul Barton Flooring, subcontracted by Ardmac, used F. Ball’s dual-purpose Stopgap Fill and Prime and Stopgap 700 Superflex flexible levelling compound to prepare 1,500m² of metal raised access panels before installing vinyl sheet floorcoverings and coving.


Stopgap Fill and Prime is a cement-based primer with a thixotropic consistency, meaning it is easily applied by hand and but sets to a gel-like consistency on standing, enabling the joints at panels to remain filled, preventing depressions resulting from a subsequently-applied levelling compound or smoothing underlayment sinking into them while setting.


Once the primer had cured, F. Ball’s Stopgap 700 Superflex flexible levelling compound was applied to create a perfectly smooth finish for the receipt of floorcoverings. The product is reinforced with tiny fibres that maintain the integrity of the levelling compound, preventing cracks from forming as a result of subfloor movement, which flexible subfloors, including metal, are prone to.


twitter.com/TContractFloors


With the subfloor preparation complete, the flooring contractors could install Tarkett IQ Granit Acoustic Vinyl sheet throughout the entire area using both F. Ball’s Styccobond F46 pressure sensitive acrylic adhesive. The high initial tack offered by Styccobond F46 made it ideal for installing floorcoverings over larger areas.


Finally, the contractors used F. Ball’s Styccobond F66 contact adhesive to install PVC coving. When the adhesive is applied to both the flooring accessory and the surface it will be adhered to and allowed to become touch-dry, surfaces will bond on contact, making it suitable for installing vertical flooring accessories. It is also solvent-free; ideal for where there are health and safety concerns, such as when working in confined spaces.


Commenting on the project, Paul Barton, Managing Director of Paul Barton Flooring, said: “This was the first time we’ve used this particular system of products from F. Ball, and we were pleased with how all of the products performed. Stopgap Fill and Prime meant that we didn’t need to overboard the raised access flooring with plywood, which saved so much time.”


www.f-ball.co.uk Follow on Twitter: @FBallUK Follow on Instagram: f_balluk Follow on LinkedIn: ‘F. Ball and Co. Ltd.’


https://twitter.com/FBallUK https://www.instagram.com/f_balluk/ https://www.linkedin.com/company/f-ball-&-co-ltd/


HEALTHCARE | 29


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50