search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
LIFTING & DECK EQUIPMENT


Lankhorst Heavy Lift Slings for Yunlin Offshore Wind Project


Heavy lift shipping and offshore transport & installation contractor, Jumbo, is using heavy lift slings from Lankhorst Ropes to install offshore wind turbine transition pieces onto monopiles situated in the Yunlin Offshore Wind Farm, Taiwan. In total, the slings will be used to lift and position 80 transition pieces from the “Jumbo Javelin”.


Located in the Taiwan Strait, some eight kilometres west of the coast of Yunlin County, the Yunlin offshore wind farm will cover an overall area of approximately 90 square kilometres. When completed,


18 www.dockyard-mag.com July 2021


this will be Taiwan’s first large multi‑megawatt offshore wind project.


The Jumbo Javelin is a dynamically positioned, heavy lift crane vessel featuring two rotating mast cranes with a combined lift capacity of 1,800t. For this project, 1,600t was the combined lifting capacity with the use of the Jumbo fly jib, a modular crane extension, at a maximum outreach of 28m. The Lankhorst LankoForce slings are fitted to a lifting tool used to aid the correct positioning of the transition pieces weighing 450 tonne. As the lifting and positioning tool features multiple slings, Lankhorst has manufactured the slings to tight tolerances of + / - 1.5%.


Made from HMPE Dyneema SK78 yarns, the LankoForce endless spliced sling (grommet) are 82mm diameter. The transition piece lifting tool will use six endless spliced sling lengths of 6.574 metre and 12 slings of 7.456 metre, depending on the size of transition piece.


“The Lankhorst slings provide the strength and level of control we need when lifting and positioning the transition pieces,” says Jochem Tacx, Project Manager, Jumbo. “Moreover, they are easy to handle and maintenance free.”


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52